My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5405 S 3RD AVE 2020-05-21
>
Address Records
>
S 3RD AVE
>
5405
>
5405 S 3RD AVE 2020-05-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/21/2020 11:20:48 AM
Creation date
5/21/2020 11:20:17 AM
Metadata
Fields
Template:
Address Document
Street Name
S 3RD AVE
Street Number
5405
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2019 System Development Fee Calculations <br /> Permit#: B1812-019 Additional Notes: <br /> Project Address: 5405 S 3RD AVE <br /> Project Name: CONSTRUCTION OF NEW ATTACHED GARAGE <br /> Answer the Following Questions(Required):All Yellow Inputs <br /> Water District: Everett — /, / / <br /> Sewer District: Everett Prepared By: �� Date: i/Z 4 I Zo(q <br /> Outside City Limits? No *Adds a 25%Surcharge tit <br /> Supportive Housing Credit? No *Reduces by 80% Reviewed By: .9* Date: '�p2 L II I <br /> Fee Calculations: <br /> Water&Sewer System Development Fees: <br /> Domestic Meter: Fee Calculation(Before Credit): Credit Calculations(Up to 3 meters for Meter-Based Calculation or 3 previous building uses for Administrative Guidelines-Based Calculation): <br /> *Subject to Administrative Guidelines Proposed Building Use: SFR/Townhome Previous Bldg Use#1: No Other Use Previous Bldg Use#2: No Other Use Previous Bldg Use#3: No Other Use <br /> ProposedUnit Measure: 1 Unit Unit Measure for Use#1: - None Unit Measure for Use#2: - None Unit Measure for Use#3: - None <br /> Note:Meter Size Used for Proposed Meter Size: None Credited Meter#1 Size: None Credited Meter#2 Size: None Credited Meter#3 Size: None <br /> Calculation Water Fee: $0.00 Water Credit#1: $0.00 Water Credit#2: $0.00 Water Credit#3: $0.00 <br /> Sewer Fee: $0.00 Sewer Credit#1: $0.00 Sewer Credit#2: $0.00 Sewer Credit#3: $0.00 <br /> Total Fees Due:Add to Utility Permit for Domestic Meter <br /> Permit#:U Water Sys Dev Fee Total: $0.00 This fee reflects credit for existing water meter <br /> Sewer Sys Dev Fee Total: $0.00 This fee reflects credit for existing water meter <br /> Total: $0.00 <br /> Irrigation Meter: Fee Calculation(Before Credit): Credit Calculations: <br /> Proposed Meter Size: None Credited Meter Size: None <br /> Water Fee: $0.00 Water Credit: $0.00 <br /> No Sewer Fee: $0.00 No Sewer Credit: $0.00 <br /> Total Fees Due:Add to Utility Permit for Irrigation Meter <br /> Permit#:U Water Sys Dev Fee Total: $0.00 This fee reflects credit for existing water meter <br /> No Sewer Sys Dev Fee: $0.00 Irrigation meters are only subject to the water portion of system development fees <br /> Total: $0.00 <br /> Fire Meter: Proposed Meter Size: None For informational purposes only <br /> Permit#:U No Sys Dev Fees: $0.00 Fire meters are not subject to system development fees <br /> Stormwater System Development Fees: <br /> Permit#:'t31SIi— 019 Type of Construction: Existing Development Adding New+Replaced Hard Surfaces <br /> Square Feet of New Plus Replaced Hard Surfaces: 600 SF <br /> Stormwater System Dev Fee: $149.22 Add this fee to the Building Permit(or Public Works Permit if there is no building permit for the project) <br />
The URL can be used to link to this page
Your browser does not support the video tag.