Laserfiche WebLink
REB 01-11-20191.FRI.r 15:0? <br /> T.J. <br /> -g 022009 <br /> 11* <br /> CT <br /> 1ERN IT No.1901014 <br /> ETT NLDG. $181,25 <br /> (425)257-8810 3 IC '25.00 <br /> Pi i�� BLDG REV $18.13 <br /> {"i ��`` <br /> $342.,1.9 <br /> Plan &CI(' No.: 81901-ui44°1' <br /> Application Date: 1/11/2019 <br /> Tenant: SOUTH POINTE ASSISTED LIVING <br /> Owner: SNH/LTA PROPERTIES TRUST <br /> Job Address: 10330 4TH AVE W <br /> Proposed Use: <br /> Description of Work: INTERIOR MOD'S TO RETURN LIVING UNIT <br /> TO CONF OF(2) STUDIOS <br /> Charged:5342.19 Paid:SO.00 <br /> PLAN CHECK FEE 117.81 NIA <br /> BASIC CONSTRUCTION PERMIT FEE 1E1.25 N/A <br /> STATE SURCHARGE IBC/IEBC 25.1D N/A <br /> r <br /> " PLANNING BLDG PERMIT REVIEk�/FEE � �mtA <br /> The building permit application for the above-referenced project is being conditionally accepted for filing <br /> pending the determination of its completeness. <br /> If the City review determines that any additional land use approval or any additional information is <br /> required to complete your building permit application, it will be necessary to submit this additional <br /> information or acquire the additional land use approval prior to your application being considered complete <br /> for filing. If no other land use approval or additional information is required,your building permit <br /> application will be considered filed as of this date. Plan review fees are estimates. Final plan review fees <br /> will be calculated at permit issuance. <br /> BUILDING PERMIT APPLICATIONS EXPIRE IF NO PERMIT IS ISSUED <br /> WITHIN 180 DAYS FOLLOWING THE DATE OF APPLICATION. <br /> D1, 1 1-‘)1 <br /> Sign. e Date <br />