My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1609 5TH ST 2020-05-21
>
Address Records
>
5TH ST
>
1609
>
1609 5TH ST 2020-05-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/21/2020 12:04:08 PM
Creation date
5/21/2020 12:01:51 PM
Metadata
Fields
Template:
Address Document
Street Name
5TH ST
Street Number
1609
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
111
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8/23/2019 <br /> It <br /> City of Everett Page 3..- <br /> 11:24:52AM ' <br /> INSPECTION ACTIVITY REPORT <br /> 3/13/2019 3/13/2019 BLDG BSM OTHER eTRAKiT Inspection 3/12/2019 9:28 AM Keith Bjella <br /> 01-CONSULTATIO Request Hello-on previous homes,you've <br /> recommended a pre-final consultation to <br /> review any items that may hold up final <br /> completion.That worked well on the last <br /> ones,so would like to schedule one for this <br /> home.I'm available any time Wednesday <br /> before 2pm,or any time Thursday. <br /> Thank you!! <br /> Contact Name:Keith Bjella <br /> Site Address: 1609 5TH ST <br /> Phone:4254220442 <br /> e-Mail:kdbjella@alliedconstruction.net <br /> (3/13/2019 10:57 AM KMK) <br /> Per phone conversation:please complete all <br /> other final inspections before calling for <br /> building final. <br /> 3/19/2019 3/19/2019 PLUMB 06-FINAL SDP APPROVAL - 3/18/2019 3:34 PM Keith Bjella <br /> Key to house located behind permanent <br /> Power Pole,roughly 5"above finish grade, <br /> hanging on a nail.Available by phone for <br /> any questions,or can meet you there.Thank <br /> you.. <br /> Contact Name:Keith Bjella <br /> Site Address: 1609 5TH ST <br /> Phone:4254220442 <br /> e-Mail:kdbjella@alliedconstruction.net <br /> (3/20/2019 7:31 AM SDP) <br /> sdp changed Inspection Type from PLUMB <br /> 06-FINAL to BLDG 03-FOUNDATION <br /> WALL <br /> 3/20/2019 3/20/2019 BLDG 15-FINAL DWF CORRECTION complete fire taping in garage,holes for fire <br /> protections. <br /> And install a air seal gasket on attic access <br /> cover in the garage. <br /> Complete install of downspouts to splash <br /> blocks. <br /> Need insulation Cert and blower door test <br /> results. <br /> 3/21/2019 3/21/2019 BLDG 15-FINAL DWF APPROVAL as noted Approved as noted,contractor/owner to <br /> provide a copy of Blower Door test results. <br /> 3/21/2019 3/21/2019 ADMIN USE KLC APPROVAL <br /> ONLY** <br /> 8/22/2019 8/22/2019 CERTIFICATE OF TAH APPROVAL CO ISSUED <br /> OCCUPANCY <br /> INSP12 CRWS YS Ai <br />
The URL can be used to link to this page
Your browser does not support the video tag.