My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9911 23RD AVE SE 2021-12-15
>
Address Records
>
23RD AVE SE
>
9911
>
9911 23RD AVE SE 2021-12-15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2021 8:53:53 AM
Creation date
5/21/2020 1:50:00 PM
Metadata
Fields
Template:
Address Document
Street Name
23RD AVE SE
Street Number
9911
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SILVER LAKE WATER & SEWER DISTRICT <br />RESERVOIR NO. 3 IMPROVEMENTS <br />PROJECT COST ESTIMATE <br />March 20, 2017 <br />ITEM <br />ESTIMATED <br />UNIT <br />NO. <br />DESCRIPTION QUANTITY <br />PRICE <br />AMOUNT <br />1. <br />Mobilization 1 LS <br />$30,000 <br />$30,000 <br />2. <br />Booster Station Structural Improvements 1 LS <br />$215,000 <br />$215,000 <br />3. <br />Bridge Crane 1 LS <br />$15,000 <br />$15,000 <br />4. <br />Booster Station HVAC Improvements 1 LS <br />$35,000 <br />$35,000 <br />5. <br />Bathroom 1 LS <br />$8,000 <br />$8,000 <br />Subtotal <br />$303,000 <br />Sales Tax 9.20% <br />$27,876 <br />ESTIMATED CONSTRUCTION COST <br />$331,000 <br />M:\SLWD\16439 - Reservoir No 3 Improvements\Cost Estimate\Reservoir 3 Cost Estimate 3-8-2017 - Permit Cost <br />Estimate <br />
The URL can be used to link to this page
Your browser does not support the video tag.