Laserfiche WebLink
SILVER LAKE WATER & SEWER DISTRICT <br />RESERVOIR NO. 3 IMPROVEMENTS <br />PROJECT COST ESTIMATE <br />March 20, 2017 <br />ITEM <br />ESTIMATED <br />UNIT <br />NO. <br />DESCRIPTION QUANTITY <br />PRICE <br />AMOUNT <br />1. <br />Mobilization 1 LS <br />$30,000 <br />$30,000 <br />2. <br />Booster Station Structural Improvements 1 LS <br />$215,000 <br />$215,000 <br />3. <br />Bridge Crane 1 LS <br />$15,000 <br />$15,000 <br />4. <br />Booster Station HVAC Improvements 1 LS <br />$35,000 <br />$35,000 <br />5. <br />Bathroom 1 LS <br />$8,000 <br />$8,000 <br />Subtotal <br />$303,000 <br />Sales Tax 9.20% <br />$27,876 <br />ESTIMATED CONSTRUCTION COST <br />$331,000 <br />M:\SLWD\16439 - Reservoir No 3 Improvements\Cost Estimate\Reservoir 3 Cost Estimate 3-8-2017 - Permit Cost <br />Estimate <br />