Laserfiche WebLink
Ms. Meg Haley <br />May 8, 2017 <br />ENERGY <br />1. The appropriate information fro 103.2 has been added to the <br />plans — see the attached plans. �"� � <br />2t This building will be heated by elec ' esistance heat. If -A-: u►�'rp1S (I'"'d <br />✓3. <br />4. <br />✓5. <br />See the Door Schedule on Sheet S2-7 of the attached revised plans. <br />The completed calculated lighting summary is included. <br />Requirements for compliance with energy efficiencies for motors and <br />transformers are included in the specifications. Exterior lighting is <br />controlled by a light level sensor through a lighting control panel. There is <br />independent control of the reservoir lighting (on for night maintenance <br />only) and the booster station building over -door lighting and area security <br />lighting — this will be shown on the drawings. The booster station interior <br />bathroom light will be controlled by an occupancy sensor/switch — this <br />will be shown on the drawings. The booster station interior lighting will <br />be controlled by manual switches only, C405.2.2 Exception 2.2.3. <br />ec '/6. The building sections have been updated to include the proposed <br />insulation systems, illustrating compliance with the building thermal <br />envelope requirements. Build envelope compliance forms have been <br />completed and are attached. <br />o,n r 4VU Vl 7. Current compliance forms have been obtained from neec.net. <br />0� MECHANICAL %i4 f s) �Rrw*- <br />Mechanical system compliance forms have been completed and are <br />attached. <br />2. This building is considered a non -occupied equipment room and as such, <br />outside air ventilation is not required per IMC Section 401. <br />3. All proposed mechanical systems are scheduled and shown on the attached <br />Sheets H-1 and H-2. <br />1* Printed on recycled paper 0 <br />