My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2302 112TH PL SE 2020-05-21
>
Address Records
>
112TH PL SE
>
2302
>
2302 112TH PL SE 2020-05-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/21/2020 2:42:14 PM
Creation date
5/21/2020 2:41:42 PM
Metadata
Fields
Template:
Address Document
Street Name
112TH PL SE
Street Number
2302
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7/25/2019 Page <br /> 2:08:36PM City of Everett <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. C1707-010 Site Address 2302 112TH PL SE#A-4 <br /> Applied 7/11/2017 Applicant Peter Anderson Lot <br /> Approved 11/8/2017 Owner SILVER LAKE TOWNHOMES LLC Block <br /> Issued 12/15/2017 Contractor M V M DEVELOPMENT&CONST INC Tract <br /> Parent Permit No. PW 1704-048 Description NEW TOWNHOUSE-UNIT 4 BLDG A <br /> Notes PLANNING INSPECTION REQUIRED PRIOR TO FINAL. CONTACT GRACE POLLARD <br /> 425-257-8807 <br /> Scheduled Completed Tvne Inspector Result Remarks Inspector's Comments <br /> 1/16/2018 1/16/2018 BLDG KMK APPROVAL OK to pour <br /> 02-FOOTING/SETB <br /> 1/16/2018 1/16/2018 BLDG 04-UFER KMK APPROVAL OK to pour <br /> GROUND <br /> 1/17/2018 1/17/2018 BLDG KMK OTHER Contractor to provide geo soils reports and <br /> 01-CONSULTATIO final letters,verifying ground is suitable for <br /> intended structure as discussed. <br /> 1/22/2018 1/22/2018 BLDG KMK APPROVAL <br /> 03-FOUNDATION <br /> 2/8/2018 2/8/2018 PLUMB DXW APPROVAL <br /> 02-GROUND <br /> 4/4/2018 4/4/2018 BLDG KMK CORRECTION Call for special <br /> 07-EXTERIOR inspection <br /> 4/5/2018 4/5/2018 BLDG KMK APPROVAL See notes 1.Provide special inspection reports as per <br /> 01-CONSULTATIO S-1 page on approved plans to include <br /> framing,shear,hold-downs,straps,and <br /> drag-struts. <br /> 2.Provide final letters. <br /> 5/16/2018 5/16/2018 BLDG KMK OTHER Submit revisions and <br /> 01-CONSULTATIO recall <br /> 5/17/2018 5/17/2018 PLUMB DXW OTHER Studor vent OK for <br /> 01-CONSULTATIO kitchen sink <br /> 6/27/2018 6/27/2018 PLUMB DXW CORRECTION Not complete <br /> 03-ROUGH IN <br /> 6/27/2018 6/27/2018 MECH 04-ROUGH DXW CORRECTION Not complete <br /> IN <br /> 6/27/2018 6/27/2018 BLDG KMK PARTIAL APPR OK to cover one side <br /> 10-INTERIOR of party wall <br /> 6/28/2018 6/28/2018 PLUMB DXW APPROVAL As noted:pressure tested at 82psi PRX <br /> 03-ROUGH IN required all units. <br /> 7/17/2018 7/17/2018 MECH 04-ROUGH DXW CORRECTION 30"x30"work platform at unit in attic on <br /> IN service side of unit. <br /> Add-strap to condensate top floor. <br /> 7/18/2018 7/18/2018 BLDG KMK OTHER Pre-rock/fire <br /> 01-CONSULTATIO separation-In <br /> progress <br /> 7/24/2018 7/24/2018 MECH 04-ROUGH DXW CORRECTION 30 x 30 work platform required on service <br /> IN side of unit in attic. <br /> 7/24/2018 7/24/2018 PLUMB DXW CORRECTION PRV must be accessible and cannot use <br /> 03-ROUGH IN clamps on water service.Use ford fitting. <br /> This is for all units. <br /> 7/27/2018 7/27/2018 MECH 04-ROUGH DXW APPROVAL <br /> IN <br /> 8/1/2018 8/1/2018 BLDG KMK OTHER Complete fire separation at party walls. <br /> 01-CONSULTATIO Verify type of hangers to be used on <br /> parallams in garage. <br /> 8/2/2018 8/2/2018 BLDG 13-OTHER TMB CORRECTION Verify hangar and hardware specifications <br /> at parallam connections.No roof openings <br /> allowed within 4ft of 2hr walls.2 layers <br /> GWB required at all party walls <br /> (completely)behind tubs etc. <br /> INSP12 CRW5 Y S7E <br />
The URL can be used to link to this page
Your browser does not support the video tag.