Laserfiche WebLink
7/25/2019 page 1 <br /> • <br /> City of Everett <br /> 2:12:49PM 3„ <br /> INSPECTION ACTIVITY REPORT --- <br /> Permit No. C1707-008 Site Address 2306 112TH PL SE#A-2 <br /> Applied 7/11/2017 Applicant Peter Anderson Lot <br /> Approved 11/8/2017 Owner SILVER LAKE TOWNHOMES LLC Block <br /> Issued 12/15/2017 Contractor M V M DEVELOPMENT&CONST INC Tract <br /> Parent Permit No. PW 1704-048 Description NEW TOWNHOUSE-UNIT 2 BLDG A <br /> Notes PLANNING INSPECTION REQUIRED PRIOR TO FINAL. CONTACT GRACE POLLARD <br /> 425-257-8807 <br /> Scheduled Completed Tyne Inspector Result Remarks Inspector's Comments <br /> 1/16/2018 1/16/2018 BLDG 04-UFER KMK APPROVAL OK to pour <br /> GROUND <br /> 1/16/2018 1/16/2018 BLDG KMK APPROVAL OK to pour <br /> 02-FOOTING/SETB <br /> 1/17/2018 1/17/2018 BLDG KMK OTHER Contractor to provide geo soils reports and <br /> 01-CONSULTATIO final letters,verifying ground is suitable for <br /> intended structure as discussed. <br /> 1/22/2018 1/22/2018 BLDG KMK APPROVAL <br /> 03-FOUNDATION <br /> 2/8/2018 2/8/2018 PLUMB DXW APPROVAL <br /> 02-GROUND <br /> 4/4/2018 4/4/2018 BLDG KMK CORRECTION Call for special <br /> 07-EXTERIOR inspection <br /> 4/5/2018 4/5/2018 BLDG KMK APPROVAL See notes 1.Provide special inspection reports as per <br /> 01-CONSULTATIO S-1 page on approved plans to include <br /> framing,shear,hold-downs,straps,and <br /> drag-struts. <br /> 2.Provide final letters. <br /> 5/16/2018 5/16/2018 BLDG KMK OTHER Submit revisions and <br /> 01-CONSULTATIO recall <br /> 6/27/2018 6/27/2018 BLDG KMK PARTIAL APPR OK to cover one side <br /> 10-INTERIOR of party wall <br /> 6/27/2018 6/27/2018 PLUMB DXW CORRECTION Mechanical not <br /> 03-ROUGH IN complete <br /> 6/27/2018 6/27/2018 MECH 04-ROUGH DXW APPROVAL As noted Check water pressure and complete tub <br /> IN values. <br /> 7/17/2018 7/17/2018 MECH 04-ROUGH DXW APPROVAL As noted 1st floor bath exhaust must have 2 layers <br /> IN off sheet rock on party wall.Subject to <br /> building inspection. <br /> 7/18/2018 7/18/2018 BLDG KMK OTHER Pre-rock/fire <br /> 01-CONSULTATIO separation-In <br /> progress <br /> 8/1/2018 8/1/2018 BLDG KMK OTHER 1.Complete fire separation at party wall <br /> 01-CONSULTATIO 2.Verify type of hangers to be used on <br /> parallams in garage. <br /> 8/1/2018 8/1/2018 BLDG 13-OTHER TMB CORRECTION Verify hangar and hardware specifications <br /> at parallam connections.No roof openings <br /> allowed within 4ft of 2hr walls.2 layers <br /> GWB required at all party walls <br /> (completely)behind tubs etc. <br /> 8/6/2018 8/6/2018 BLDG KMK CORRECTION Provide special inspection and engineer's <br /> 08-FRAMING letter. <br /> 8/8/2018 8/8/2018 BLDG KMK CORRECTION 1.Provide special inspection reports <br /> 08-FRAMING regarding all framing to include hangars, <br /> hold-downs before you insulate. <br /> 2.Verfiy with site visit from engineer of <br /> record to verify type and application of <br /> hangars used for parrallam to LSL <br /> connection in garage. <br /> Note:Only 50%of hangar is being used. <br /> INSP12 CfillirsYSTEMS <br />