Laserfiche WebLink
Planning and Community Development Department <br /> August 10, 2015 <br /> Job Address: 29 112th Street SE (lot#1) <br /> Permit No.: C1507-017 <br /> Project: New SFR <br /> Dear Mr. Harvey, <br /> In response to your application for a building permit,the plans submitted have been examined <br /> and the Planning Department cannot approve the application until the following corrections are <br /> made: <br /> • EMC Title 19 Table 6.1 Minimum Required Setback: Side, interior: 5'. <br /> Proposed SFR plans show a footprint width of forty feet which does not allow for the <br /> required five-foot setbacks on a 49.98-foot lot. <br /> • Elevation Sheet. An updated elevation sheet is required with site specific height <br /> calculations. <br /> Upon receipt of revisions the Planning Department will continue its review of your building <br /> permit. <br /> You can reach me directly to discuss this letter by email at gpollard@everettwa.gov or by phone <br /> at 425.257.8807. <br /> Sincerely, <br /> Grace Pollard <br /> Assistant Planner <br /> m 2930 Wetmore Avenue, Suite 8-A,Everett,WA 98201-4044 fe 425.257.8731,Fax 425.257.8742 <br />