Laserfiche WebLink
03-26-2019(U) 14:38 <br /> CT I <br /> PERMIT 1.10.191JJ,M <br /> Eir <br /> - (425)257-8810 =:4 = 5 <br /> 010 <br /> Plan Check No.: C1903-013 <br /> Application Date: 3/26/2019 <br /> Tenant: [TenName] <br /> Owner: HOUGHTON JAMES M <br /> Job Address: 332 MADISON ST <br /> Proposed Use: SFR CONVERT TO DUPLEX <br /> Description of Work: CONVERT SFT&GARAGE TO A DUPLEX <br /> BY CONNECTING BLDGS <br /> Plan Check Fee Paid: $645.94 <br /> The building permit application for the above-referenced project is being conditionally accepted for filing <br /> pending the determination of its completeness. <br /> If the City review determines that any additional land use approval or any additional information is <br /> required to complete your building permit application,it will be necessary to submit this additional <br /> information or acquire the additional land use approval prior to your application being considered complete <br /> for filing. If no other land use approval or additional information is required,your building permit <br /> application will be considered filed as of this date. Plan review fees are estimates. Final plan review fees <br /> will be calculated at permit issuance. <br /> BUILDING PERMIT APPLICATIONS EXPIRE IF NO PERMIT IS ISSUED <br /> WITHIN 180 DAYS FOLLOWING THE DATE OF APPLICATION. <br /> r <br /> Signa e ) Date <br /> FILE COPY <br />