Laserfiche WebLink
_ _ _ - --- ___ . <br /> IDesign Cri[eria Submittals Wood (cont.) � ��� � � � <br /> � � <br />, � ��. 1 . All materials, workm[mship, design and construction shall conform to L Submittals are required for the following structural work: 12. Alternate connectors may be used subject to review and approval by [i,] � <br /> ��� the drawings, specifications and lhe following documents�. [he archilect and engineer. Alternate hardware connectors may be [� ?, w <br /> o I <br /> I 2. International Building Code QBC), 2015 Edition • None used subject to review and approval by the architect and structural � � x � <br /> �i 3. American Society of Civil Engineers Minimum Design Loads (ASCE engineer. A current NER or ICGES report shall be submitted, along �--� ^� 1 <br /> � ' 7-10) Wood with a one-for-one listing of each proposed connector substi[ution � � z , <br /> I4. National Design Specification for Wood Construction (ANSI / AWC along wi[h differences in manufacturer recommended capacities. The ..�i � _ . <br />' � I NDS-2012) 1 . Framing lumber shall be kilo-dried or MG19, graded and marked In contractor shall be responslble for all engineering costs related to the � ^' <br />