|
�;•
<br /> GENERAL CONDITIONS FOR THE DIVISION 1 GENERAL REQUIREMENTS DIVISION 2 - SITE WORK DIVISION 3 - CONCRETE DIVISION 5 - METALS �
<br /> CONTRACT FOR CONSTRUCTION 1,SCOPE 10.PROTECTIONANDCLEAN-UP 1.DEMOLITION REFERTOSTRUCTURALDRAWINGSFORCONCRETESPECIFICATIONS � EX�
<br /> SCOPE ALL OF THE WORK UNDER EACH HEADING OF THESE SPECIFICATIONS SHALL BE THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROPER PROTECTION OF ADJACENT PROVIDE DEMOLITION AND REMOVAL OF STRUCTURES,PAVEMENT,SIDEWALKS,CURBS, 1,STEEL FRAMING � , �
<br /> GOVERNED BY THE GENERAL CONDITIONS,SPECIAL PROVISIONS,THE DRAWINGS AND ITEMS AND SURFACES FROM DAMAGE RESULTING FROM THE FURNISHING OR ETC.AND THE CAPPING OF EXISTING UTILITIES. REMOVE ABOVE GRADE AND BELOW � �
<br /> ARTICLE 1 -GENERAL PROVISIONS THE SPECIFICATIONS,AS WELL AS THE FOLLOWING GENERAL REQUIREMENTS INSTALLATION OF HIS WORK AND SHALL PROMPTLY REPLACE,AT HIS OWN COST,SUCH GRADE IMPROVEMENTS AND REMOVE GROWTH AND VEGETATION AT THE SITE. D I V I S I O N 4 - MAS�N RY REFERENCE STRUCTURAL DRAWINGS FOR STEEL FRAMIN�SPECIFICATIONS � �
<br /> DAMAGED WORK. HE SHALL ALSO BE RESPONSIBLE FOR THE PROPER PROTECTION OF 1. GENERAL NOTES � �
<br /> 1.THE STANDARD FORM OF GENERAL CONDITIONS,CURRENT EDITION OF THE THE WORK UNDER EACH HEADING OF THESE SPECIFICATIONS SHALL INCLUDE ALL LABOR, HIS AND OTHERS WORK FROM DAMAGE BY ANY INCLUDING FREEZIN�OR OVERHEATING. COMPLY WITH ALL APPLICABLE CODES,ORDINANCES,REGULATIONS AND STANDARDS. IN 2, MISCELLANEOUS METALS
<br /> AMERICAN INSTITUTE OF ARCHITECTS,DOCUMENT N0.A-201,ARE HEREBY MADE MATERIAL,EQUIPMENT AND SERVICES NECESSARY FOR AND SAID HEADING AS INDICATED USE PLASTIC COVERING OVER FURNITURE,DISPLAY CASES, EQUIPMENT AND FINISHES, CASE OF CONFLICT THE MORE STRINGENT REQUIREMENT SHALL GOVERN, �'�
<br /> A PART OF THESE SPECIFICATIONS AND SHALL APPLY THE SAME AS IF REPEATED ON THE DRAWINGS,SET FORTH IN THE SPECIFICATIONS,OR OTHERWISE REQUIRED, THE CONTRACTQR SHALL REMOVE ALL DEBRIS FROM THE PREMISES ON A DAILY BASIS; ALL MATERIALS AND WORKMANSHIP SHALL CONFORM TO THE REQUIREMENTS OF ALL � O O o
<br /> HERE IN FULL. COPIES OF SAME SHALL BE ON FILE AT THE OFFICE OF THE ALL DUST AND CONSTRUCTION DEBRIS ARE TO BE REMOVED.ANY BROKEN,DAMAGED, SCHEDULE AND EXECUTE ALL WORK IN A CAREFUL MANNER WITH ALL CONSIDERATION LOCAL CODES AND STANDARDS, CUSTOM FABRICATE FERROUS METAL ITEMS 16 GAUGE AND HEAVIER, REFER TO !
<br /> ARCHITECT. DRAWINGS AND DETAILS,
<br /> WORK DONE HEREUNDER INCLUDES FURNISHING ALL LABOR,MATERIAL SERVICES,AND MARRED,UNCLEAN,OR OTHERWISE IMPERFECT WORK SHALL BE CORRECTED BY THE FOR NEIGHBORS AND THE PUBLIC TO PREVENT INJURY TO PERSONS OR PROPERTY. � �
<br /> EQUIPMENT NECESSARY ANDlOR INCIDENTAL TO PERFORM ALL WORK THROUGH THE CONTRAGTOR BEFORE HIS WORK SHAIL BE CONSIDERED COMPLETE. USE DUST CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND CONDITIONS ON THE JOB SITE AND 3.METAL STUDS �► �
<br /> 2.ALL INTERESTED PARTIES SHALL BE GOVERNED BY THOSE GENERAL PROPER COMPLETION OF ALL WORK AS MAY BE FURTHER SPECIFIED AND/OR SHOWN ON BARRIERS. PRIOR TO ALL DEMOLITION WORK CAREFULLY INSPECT THE ENTIRE SITE AND ALL REPORT ANY ERRORS,OMISSIONS,OR POSSIBLE DISCREPANCIES TO THE ARCHITECT �
<br /> CONDITIONS IN ALL MATTERS PERTAINING TO THIS PROJECT,DURING THE THE PLANS,OR OTHERWISE REQUIRED, OBJECTS TO BE DEMOLISHED AND/OR LEFT INTACT AND DETERMINE AN ORDERLY AND PANDA EXPRESS PRIOR TO COMMENCING ANY WORK,SPECIAL CARE SHALL BE GIVEN � � �
<br /> PERIOD OF CONSTRUCTION,AND PARTICIPATION IN THE PROJECT WILL BE UPON COMPLETION OF THE WORK CONTRACTOR SHALL CLEAN INTERIQR AND EXTERIOR SEQUENCE FOR THE DEMOLITION. LOCATE ALL EXISTING UTILITY LINES AND DETERMINE TO THE SITE AND BUILDIN�LAYOUT THEREON. INSTALL METAL FRAMING SYSTEMS IN ACCORDANCE WITH MANUFACTURER'S PRINTED OR " �' G
<br /> CONSIDERED PRESUMPTNE EVIDENCE OF THE RARTICIPANT'S FUIl 2,CONFLICTS BETWEEN DOCUMENTS QF ALL GlASS AND GIAZIN�,FLOORS,WALLS AND CEILING SURFACES,ELECTRICAL THE REQUIREMENTS FOR DISCONNECTION AND CAPPING. LOCATE ALL ACTIVE UTILITY WRITTEN INSTRUCTIONS AND RECOMMENDATIONS,UNLESS OTHERWISE INDiCATED. �E K��
<br /> UNDERSTANDWG OF,AND AGREEMENT WITH,THE CONDITIONS OF THE FIXTURES,MECHANICAL EQUIPMENT,ETC.;IT IS NECESSARY TO REMOVE ALL DIRT, LINES TRAVERSING THE SITE AND DETERMINE THE REQUIREMENTS FOR PROTECTION. INSTALL CONTINUOUS TRACK•SIZED TO MATCH STUDS, SECURE TRACKS AS
<br /> REFERENCED GENERAL CONDITIONS. IN CASE OF CONFLICT BETWEEN DRAWIN�S AND SPECIFICATIONS THE CONTRACTQR WILL STAINS,AND MARKS,THE SIGNS,GLASS AND WOOD SHALL BE CLEANED AND POLISHED. TNE CONTRACTOR SHALL PROVIDE SAFE AND ADEQUATE BRAGES AND CONNECTIONS TO RECOMMENDED BY STUD MANUFACTURER FOR TYPE OF CONSTRUCTION INVOLVED.
<br /> BE DEEMED T4 HAVE ESTIMATED ON,AND AGREED TO PROVIDE,THE GREATEST THE 5TORE SHALL BE MADE CLEAN AND FIT FOR IMMEDIATE OCCUPANCY BY AN PROTECTION:7HE CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR PROTECTION OF SUPPORT THE COMPONENT PARTS OF THE STRUCTURE UNTIL THE STRUCTURE ITSELF
<br /> 3.THE GENERAL CONDITIONS,SPECIAL PROVISIONS,GENERAL REQUIREMENTS, QUANTITY AND BE'i"fER QUALITY OF MATERIALS AND WORK. INDEPENDENT CLEANING AGENT,WITH THE APPROVAL OF PANDA EXPRESS,AT THE EXISTING BUILDINGS,SURROUNDING PROPERTY AND ALL PERSONS.THE CONTRACTOR (�NCLUDING THE FLOOR AND ROOF DIAPHRAGMS)IS GOMPLETE ENOUGH TO ADEQUATELY PANDA EXPRESS, INC.
<br /> SUPPORT ITSELF. SET STUDS PLUMB,EXCEPT AS NEEDED fOR DIAGONAL BRACING OR REQUIRED FOR
<br /> AND TECHNICAL SPECIFICATIONS,ALONG WITH THE OTHER CONDITIONS WHICH CONTRACTOR'S EXPENSE. SHALL ALSO PROVIDE ALL SHORIN�,TEMPORARY BARRICADES AND TEMPORARY NON-PLUMB WALLS OR WARPED SURFACES, 'I GH3 WalttUt GCOV2 AV@.
<br /> FOLLOW,AND AS PROVIDED,AS WELL AS ALL APPLICABLE PROVISIONS OF THE INCLUDE GENERAL CONSTRUCTION,ELECTRICAL,PLUMBING,HVAC,AND INSTALLATION OF ENCLOSURES AS NECESSARY TO PROTEGT ADJACENT PROPERTY FROM DAMAGE. ROS@CTt@aCI, California y�
<br /> SPECIFICATIONS,FORM A PART OF THE CONTRACT AND SHALL GOVERN EACH ALL SUCH WQRK EXCEPT AS HEREINAFTER MAY BE REQUIRED. GENERAL CONTRACTOR SHALL SUPERVISE AND SCHEDULE PROPER INSTALLATION OF ALL OPTIONS,IF PROVIDED HEREIN,ARE NOTED FOR CONTRACTOR'S CONVENIENCE.HE
<br /> CONTRACTOR ENGAGED IN WORK ON THE PROJECT WHETHER THE WORK BE PARTS OF WORK PERTAINING TO A FINISHED PRODUCT BY HIM OR BY THE OWNER. TAKE ALL MEANS NECESSARY TO PREVENT THE SPREAQ OF DUST DURING DEMOLITION SHALL BE RESPONSIBLE FOR ALL CHANGES NECESSARY,SHALL COORDINATE ALL INSTALL SUPPLEMENTARY FRAMIN�,BLOCKING AND BRACING IN METAL FRAMING SYSTEM 91770
<br /> LET UNDER SEPARATE CONTRACTS OR UNDER A SINGLE CONTRACT. 3.ITEMS FURNISHED BY PANDA AND INSTALLED BY GENERAL CONTRACTOR OPERATIONS. THQROUGHLY MQISTEN ALL GROUND SURFACES AS OFTEN AS REQUIRED DETAILS,AND SHALL OBTAIN ALL REQUIRED APPRQVALS. WHENEVER WALL OR PARTfTIONS ARE INDICATED TO SUPPORT FIXTURES,EQUIPMENT, •
<br /> GENERAL CONTRACTOR SHALL SUPERVISE AND SCHEDULE PROPER INSTALLATION OF ALL TO PREVENT DUST BEING A NUISANCE TO THE PUBLIC,NEIGHBORS AND THE SERVICES,CASEWORK,HEAVY TRIM AND FURNISHINGS AND SIMILAR WORK. Telephone: 626.799.9898
<br /> 4.BASIC DEFINITIONS: IT SHALL BE THE CONTRACTOR'S SOLE RESPONSIBILITY TO RECEIVE,CHECK AND PARTS OF WORK PERTAINING TO A FINISHED PRODUCT BY CONTRACTOR, CONCURRENT PERFORMANCE OF OTHER WORK ON THE SITE, COSTS OF ADDITIONAL DESIGN WORK NECESSITATED BY SELECTION OF AN OPTION OR
<br /> Facsimile: 626.372.8288 �
<br /> THE CONTRACT QOCUMENTS CONSIST OF THE AGREEMENT BETWEEN OWNER CONFIRM THE ARRIVAL IN GOOD ORDER,OF ALL ITEMS CALLED FOR TO BE FURNISHED BY SUBCONTRACTORS OR PANDA EXPRESS. DUE TO ERRORS OR OMISSIONS IN CONSTRUCTION,SHALL BE BORNE BY THE SECURE STUDS TO TOP AND BOTTOM RUNNER TRACKS BY EITHER WELDING OR SCREW
<br /> AND CONTRACTOR,CONDITIONS OF THE CONTRACT AND ALL DOCUMENTS PANDA EXPRESS AND INSTALLED BY THE CONTRACTOR. PRESERVE IN OPERATING CONDITION ALL ACTIVE UTILITIES TRAVERSING THE SITE AND CONTRACTOR, FASTENING AT BOTH INSIDE AND OUTSIDE FLANGES. '
<br /> LISTED BELOW. 11.GUARANTEE WARRANTY REQUIRED FOR FUTURE OPERATION OF THE NEW STORE AND SURROUNDING
<br /> THE CONTRACTOR SHALL NOTIFY PANDA EXPRESS(IN WRITING)OF ANY SUCH ITEMS PROPERTIES. 2. MANUFACTURED MASONRY VENEER INSTALL HOR{ZONTAL STIFFENERS IN STUD SYSTEM AS REQUIRED,SPACE(VERTICAL All ideas,designs,arrangement and plans indicated or
<br /> THE CONTRACT DOCUMENTS SHALL INCLUDE:DRAWINGS AS LISTED IN THE MISSING OR DAMAGED WITHIN 3 DAYS OF RECEIVING DATE. FAILURE TO SO NOTIFY THE CONTftACTOR SHALL GUARANTEE THE WORK TO BE FREE FROM DEFECTS OF DISTANCE)AT NO MORE THAN 4'-6"O,C. represented by this drawing are the properiy of Panda
<br /> INDEX OF THIS SET.SPECIFICATION DIVISION 1-16 INCLUSIVE.ALL MODIFICATIONS PANDA EXPRESS WILL BE CONSIDERED PROOF PRESUMPTIVE THAT ALL SAID ITEMS HAVE MATERIALS OR WORKMANSHIP,INCLUDING DISCOLORATION,RATTLING AND LEAKING,FOR COORDINATE DISCONNECTING,REMOVING,PLUGGING,ABANDONING AND RELOCATING Express Inc.and were created for use on this specific project.
<br /> ISSUED AFTER EXECUTION OF THE CONTRACT.EQUIPMENT INSTALLATION HAND ARRIVED UNDAMAGED,AND IN THE PROPER QUANTITIES,AND IT SHALL THEN BE THE A PERIOD OF ONE YEAR FROM THE DATE OF FINAL PAYMENT. APPLICATION BY THE UTILITIES WITH LOCAL UTILITY COMPANIES OR OTHER GOVERNING AGENCIES, INCLUDES PORTLAND CEMENT BASED MANUFACTURED STONE VENEER AND TRIM, None of these ideas,designs,arrangement�or plans may be
<br /> BOOK. CONTRACTOR'S RESPONSIBILITY(AT HIS OWN COST)TO PROMPTLY REORDER,REPLACE CONTRACTOR FOR FINAL PAYMENT SHALL BE CONSIDERED AS PRESUMPTIVE EVIDENCE 4.EXTERIOR ALUMINUM AWNINGS used by or disclosed to any person,firm,or corporation
<br /> ANDIOR REPAIR ANY SUCH ITEMS NEEDED FOR THE PROPER COMPLETION OF THIS OF HIS FULL UNDERSTANDING OF AND AGREEMENT WITH CONDITIONS OF THE ASBESTOS ABATEMENT REFER TO ASBESTOS CONTAINING MATERIAL(ACM)REPORT FOR COMPLY WITH ALL STANDARDS REFERENCED BY THE MANUFACTURER, COMPLY WITH ALL without the written permission of Panda Express Inc.
<br /> 5,PHRASES USED IN THE SPECIF{CATIONS ARE DEFINED AS FOLLOWS: PROJECT,ON THE AGREED TO DATE OF COMPLETION. GUARANTEE PROVISION,AND HE SHALL REMOVE AND REPLACE WITH NEW,AT HIS OWN COMPLETE DESCRIPTION OF MATERIALS IDENTIFIED. THE CONTRACTOR SHALL COMPLY APPLICABLE BUILDING CODES. ''�
<br /> "AS SHOWN"•AS SHOWN ON THE ACCOMPANYING QRAWINGS, EXPENSE,ALL SUCH WORK OR MATERIALS FOUND BY PANDA EXPRESS'S WITH ALL LOCAL,STATE AND FEDERAL RULES AND REGULATIONS FOR THE PROPER D(V I S I O N 6 - W 00 D A N D P LA ST I CS `
<br /> 4.MEASUREMENTS REPRESENTATIVE TO BE DEFECTIVE WITHIN THE�UARANTEE PERIOD. PROTECTION,REMOVAL AND DISPOSAL OF ANY ASBESTOS CONTAINING MATERIAL. SUBMITTALS:SUBMIT MANUFACTURER'S PRODUCT DATA AND VERIFICATION SAMPLES OF '
<br /> "PROVIDE"-PROVIDE AND INSTALL COMPLETE,WITH ALL NECESSARY ACCESSORIES AND THE SELECTED STONE AND MORTAR MATERIALS AS SELECTED BY PANDA. 1.WOOD FRAME AND ROOF TRUSSES REVISIONS; DATE: BY;
<br /> INCIDENTAL MATERIALS AND SUPPLIES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR AN ACCURATE TAKING OF JOB 12.SUBGONTRACTORS POLLUTION CONTROL:THE CONTRACTOR IS RESPONSIBLE FOR ENSURING TRUCKS '
<br /> SITE MEASUREMENTS,VERIFYING SAME,AND PROMPTLY FURNISHING EXACT JOB LEAVING AND ENTERING THE SITE DO NOT DROP DEMOLITION DEBRIS OR DIRT ONTO REFERENCE STRUCTURAL QRAWINGS FOR SPECIFICP,TIONS OF WOOD FRAMING �
<br /> "PROVIDED BY OWNER"-MATERIALS OR GOODS WILL BE DELIVERED f.O.B.JOBSITE BY SITE MEASUREMENTS TO ALL PARTIES REQUIRING SAME. CONTRACTOR MUST THE CONTRACTOR AGREES THAT HE IS FULLY RESPONSIBLE TO THE OWNER FOR THE PUBLIC STREETS, WARRANTIES: SUBMIT MANUFACTURER'S AND INSTALLER'S WARRANTIES UPON 0
<br /> THE OWNER AT NO EXPENSE TO THE GENERAL CONTRACTOR, UNLOADING,STORAGE, COMPLETION OF THE JOB, WARRANTY SHALL COVER DEFECTS IN MATERIALS AND AND TRUSSES 2
<br /> NOTIFY PANDA EXPRESS AN�THE ARCHITECT OF ANY DISCREPANCIES ACTS AND OMISSIONS OF HIS SUBCONTRACTORS AND OF PERSONS DIRECTLY EMPLOYED INSTALLATION FOR 5 YEARS AFTER ACCEPTANCE BY PANDA, �
<br /> INSTALLATION,ANDIOR ASSEMBLY OF ITEMS"PROVIDED BY OWNER"SHALL BE BY IMMEDIATELY.THE CONTRACTOR SHALL CHECK SALES CASEWORK SHOP BY HIM. NOTHING CONTAINED IN THE CONTRACT DOCUMENTS SHALL CREATE ANY THE CONTRACTOR IS RESPONSIBLE FOR THE PREVENTION OF SO{L EROSION AND SILT
<br /> 2, FINISH CARPENTRY MATERIALS 0
<br /> GENERAL CONTRACTOR UNLESS OTHERWISE NOTED. DRAWINGS AS TO CORRECT ANGLES AND FIT TO THE EXISTING SPACE AS GONTRACTUAL RELATION BETWEEN ANY SUBCONTRACTOR AND PANDA EXPRESS.THE FROM LEAVING THE SITE. Q
<br /> "INSTALL"-INSTALL ITEMS,COMPLETE,PROVIDING ALL INCIDENTAL AND NECESSARY SHOWN. THE CONTRACTOR SHALL PERMANENTLY LAYOUT THE CASEWORK ON CONTRACTOR SHAIL COOPERATE WITH PANDA AND OTHER CONTRACTORS PERFORMING QUALITY ASSURANCE: 4
<br /> SUPPLIES AND MATERIALS. THE FLOOR PRIOR TO THE CONSTRUCTION OF WALL,CEILING,LIGHT FiXTURES, WORK UNDER SEPARATE CONTRACTS TO ENSURE PROJECT PROGRESS ACCORDING TO FILLING BASEMENTS&VOIDS;COMPLETELY FILL BELOW GRADE AREA AND VOIDS INSTALLER QUALIFICATIONS:EXPERIENCED MASON FAMILIAR WITH INSTALLATION QURLITY ASSURANCE: a
<br /> ETC. SCHEDULE,THE CONTRACTOR SHALL COORDINATE WORK FOR THE VARIOUS TRADES RESULTING FROM THE DEMOLITION OF THE STRUCTURE AND UTILITIES. PROCEDURES FOR MANUFACTURED VENEER,CERTIFICATIONS REQUIRED PER PERFORM FINISH CARPENTRY WORK IN ACCORDANCE WITH AWI QUALITY STANDARDS, Q
<br /> "GENERAL CONTRACTOR"-THE GENERAL CONTRACTOR OR ANY OR ALL OF HIS VARIOUS INCLt1DING PANDA EXPRESS'S VENDORS. MANUFACTIJRER'S STANDARDS, PREMIUM GRADE, USE FULL LENGTH PIECES,MITER ALL JOINTS,SHOULDER JOINT AT
<br /> SUBCONTRACTORS. WRITTEN DIMENSIONS SHALL TAKE PRECEDENCE OVER SCALED DIMENSIONS. REFER TO THE GEO-TECHNICAL REPORT FOR FILL MATERIAL AND PLACEMENT METHODS. DOOR JAMBS. FILL ALL NAIL HOLES ANQ SAND SMOOTH, � i=�
<br /> LARGER SCALE DRAWWGS SHALL TAKE PRECEDENCE OVER SMALLER SCALE 13.TEMPORARY FACILITIES PLACE FILL,COMPACT AND GRADE THE SURFACE TO MEET ADJACENT GRADES AND AS MANUFACTURER:
<br /> "OWNER"-ALL GENERAL CONDITIONS REFERENCES TO"OWNER°SHALL REFER TO PANDA DRAWINGS. SHOWN ON THE DRAWINGS. WOOD TRIM INTERIOR:VERTICAI GRAIN,RED OAK SURFACE ALL EXPOSED EDGES, `
<br /> EXPRESS,INC, PROVIDE AND COMPLETE ALL PRELIMINARY WORK AND 7EMPORARY CONSTRUCTION REFERENCE"EXTERIOR FINISH SCHEDULE"SHEET G-005 -
<br /> � n „ „ 5.SUBSTITUTIONS REQUIRED AS INDICATED AND REQUIRED, DISPOSAL OF DEMOLISHED MATERIALS EXPOSED WOOD AT EXTERIOR:RESAWN DOUGLAS FIR,NO KNOTS,STAIN GRADE, "
<br /> CONTRACTOR AND GENERAL CONTRAGTOR AS STATED IN THESE DOCUMENTS REFER A,REMOVE FROM SITE AND LEGALLY DISPOSE ALL RUBBISH,DEBRIS AND ALL MATERIALS STONE VENEER TYPE AND FINISH: ISSUE DATE;
<br /> TO THE SAME ENTITY. BIDDERS MAY OFFER SUBSTITUTIONS FOR ANY ITEM SPECIFICATION BY TEMPORARY BARRICADES; RESULTING FROM THE DEMOLITION OPERATIONS. REFERENCE"EXTERIQR FINISH SCHEDULE"SHEET G-005
<br /> SUBMITTING IN WRITING AS OUT�INED IN SPACE PROVIDED ON PROPOSAL FORM. INSTALL TEMPORARY BARRICADE AS REQUIRED BY CITY OFFICIALS OR MALL
<br /> ARTICLE 2 -INSURANCE MANAGEMENT IN MANNER STIPULATED BY SAME. 2.EARTHWORK MORTAR:MORTAR ALL JOINTS.IISE MORTAR COMPLYING WITH ASTM STANDARDS:
<br /> IT SHALL BE UNDERSTOOD BY ALL HEREIN CONCERNED THAT ANY PROPOSAL CEMENT ASTM C270;LIME ASTM C207;SAND ASTM C144;WATER SHALL BE PQTABLE.
<br /> THE GENERAL CONTRACTOR AND ALL SUBCONTRACTORS ARE REQUIRED TO OBTAIN THE SUBSTITUTION SHALL HAVE THE WRITTEN APPROVAL OF ARCHITECT AND/OR LIGHT AND POWER SHALL BE PROVIDED BY ELECTRICAL CONTRACTOR OR REUSE LOCATE EXISTING UNDERGROUND UTILITIES BY CAREFUL HAND EXCAVATION PREPACKAGED LATEX PORTLAND CEMENT MORTAR SHALL COMPLY WITH ANSI A118.4.
<br /> FOLLOWING INSURANCES,AND AT THEIR REQUEST FURNISH EVIDENCE TO PANDA OWNER'S REPRESENTATIVE,BEFORE BEING USED BY CONTRACTOR,OTHERWISE EXISTING FROM IOCATION OF LANDLORD'S SERVICE AND PAY ALL COST FOR SAME,FOR BEFORE STARTING EARTHWORK OPERATIONS. IF UTIIITIES ARE TO REMAIN IN
<br /> EXPRESS. ALL INSURANCE SHALL NAME PANDA RESTAURANT GROUP,(NC.,AND THE IT WILL BE ASSUMED THAT THE CONTRACTOR'S TOTAL BI�IS BASED UPON THE ALL CONTRACTOR(S)TO SUBJECT SPACE. PLACE, PROVIDE PROTECTION FROM DAMAGE DURING CONSTRUCTION PROVIDE COLORED MORTAR AS SELECTEO BY PANDA.COLOR PIGMENT SHALL COMPLY
<br /> ARCHITECTS,AS ADDITIONAL INSURED PARTIES. MATERIAL OR ITEM OF EQUIPMENT SPECIFIED. OPERATIONS.CONTACT LOCAL UTILITY COMPANY FOR INFORMATION REGARDING WITH ASTM C979,MINERAL OXIpE PIGMENTS.
<br /> WATER Sl1PPLY; UNDERGROUND UTILITIES.
<br /> WORKMAN'S COMPENSATION INSURANCE IN ACCORDANCE WITH THE LAWS OF THE STATE 6.EXAMINATION OF SITE AND BUILDING THE CONTRACTOR SHALL MAKE ALL NECESSARY ARRANGEMENTS FQR PERMANENT
<br /> IN WHICH THE PROPERTY IS LOCATED AND PANDA EXPRESS REQUIREMENTS.PANDA WATER SERVICE,WATER METER,AND PRESSURE REGULATOR FOR ALL PURPOSES OF SHOULD UNCHARTED OR INCORRECTLY CHARTEd PIPING OR OTHER UTILITIES BE EXECUTION:PREPARE SUBSTRATE IN ACCORDANCE WITH MANUFACTURER'S
<br /> EXPRESS SHALL KEEP A COPY IN FILE ALL TIME, BEFORE SUBMITTING A PROPOSAL,EACH BIDDER SHALL EXAMINE ALL DOCUMENTS,VISIT CONSTRUCTION,PAYING ALL COSTS IN CONNECTION WITH SAME,AND FOR ALL WATER ENCOUNTEREQ DURING EXCAVATION,CONSULT THE OWNER IMMEDIATELY FOR INSTALLATION INSTRUCTIONS, ,
<br /> THE SITE,VERIFYING ANY SPECIAL CHARGES OR REQUIREMENTS,COMPARING EACH TO USED. THIS SHALL WCLUDE ALL MEANS OF CONVEYING SAME TQ PLACE WHERE DIRECTIONS AS TO PROCEDURES. REPAIR DAMAGED UTILITIES TO THE SATISFACTION OF
<br /> COMPREHENSIVE GENERAL LIABILITY INSURANCE INCLUDING CONTRACTUAL LIABILITY THE OTHER AND INFORMING THEMSELVES OF ALL CONDITIONS UNDER WNICH WORK IS TO REQUIRED, THE UTILITY OWNER. COOPERATE WITH THE OWNER,AND PUBLIC AND PRIVATE UTILITY EXAMINE SUBSTRATES UPON WHICH WORK WILL BE INSTALLED.COORDINATE WITH
<br /> WITH LIMITS SET FORTH BY THE PANDA EXPRESS. BE PERFORMED. INCLUDE ALL RELEVANT MATTERS WHICH MAY AfFECT THE WORK OR COMPANIES IN KEEPING SERVICES AND FACILITIES IN OPERATION. GENERAL CONTRACTOR TO REMEDY ANY UNSATISFACTORY SUBSTRATES,NOTIFY PANDA DRAWN BY: CRM Architects & Planners, I11C. �
<br /> THE BIDDING. EACH BIDDER SHALL BASE HIS PROPOSAL ON MATERIAL,METHODS AND/OR ELECTRICITY: EXPRESS IN WRITING OF ANY UNSATISFACTORY SUBSTRATES.COMMENCEMENT OF
<br /> AUTOMOBILE LIABILITY INSURANCE INCLUDING CONTRACTUAL LIABILITY AS SET FORTH BY EQUIPMENT COMPLYING WITH THE SPECIFICATIONS AND DRAWINGS. THE CONTRACTOR SHALL MAKE ALL NEGESSARY APPLICATIONS,PAY ALL DUES AND BARRICADE OPEN EXCAVATION AND POST WITH WARNING LIGHTS FOR THE SAFETY OF WORK BY THE INSTALLER SHALL INDICATE HIS ACCEPTANCE OF THE SUBSTRATE,
<br /> THE PANDA EXPRESS. CHARGES,OBTAIN NECESSARY PERMITS,PROVIDE AND MAINTAIN ELECTRICAL ENERGY PERSONS,OPERATING WARNING LIGHT DURING HOURS OF DUSK TO DAWN EACH DAY,
<br /> THE WORDS"THE CONTRACTOR SHALL"ARE INTENTIONALLY OMITTED FROM THE FROM DEVELOPERS PERMANENT ELECTRICAL FACILITIES FOR LIGHTING,POWER FOR ALL INSTALL ALL WORK IN CONFORMANCE WITH THE MVMA(MASONRY VENEER
<br /> BUiLDER'S RISK INSURANCE IN THE AMOUNT OF THE ESTIMATED COST OF THE PROJECT. SPECIFICATIONS, WHERE DIRECTIONS OR INSTRUCTIONS ARE STATED,WITHOUT ELECTRIG TOOLS AND EQUIPMENT REQUIRED IN CONSTRUCTION OF ALL BRANCHES OF PROTECT STRUCTURE,UTILITIES,SIDEWALKS,PAVEMENTS,AND OTHER FACILITIES MANUFACTURER'S ASSOCIATION)"INSTALLATION GUIDE FOR ADHERED CONCRETE PANDA PROJECT#; S5-19-D5892
<br /> SPECIFIC REFERENCE AS TO WHO IS RESPONSIBLE,THE INFERENCE IS INTENDED TO BE THE WORK AND PAY FOR ALL CURRENT USED. IMMEDIATELY ADJACENT TO EXCAVATIONS,FROM DAMAGES CAUSED BY SETTLEMENT, MASONRY VENEER".
<br /> THE CONTRACTOR AGREES TO INDEMNIFY AND SAVE NARMLESS PANDA EXPRESS,ITS THE CONTRACTOR FOR THE WORK IN THE SPECIFICATION SECTION IN WHICH THE LATERAL MOVEMENT,UNDERMINING,wASHouT AN�orHER H,az,aR�s. ARCH PROJECT#: CRM 1756
<br /> AGENTS,SERVANTS,AND EMPLOYEES,AND THE OWNER'S ARCHITECT AND ENGINEER DIRECTIONS OR INSTRUCTIONS ARE INTENDED. FIRE PROTECTION:
<br /> FROM AND AGAINST ANY AND ALL LIABILITY OR DAMAGE TO PROPERTY OCCASIONED BY OWNER'S CONTRACTOR SHALL PROVIDE FIRE EXTINGUISHERS WITHIN THE PREMISES AS ALL FILL AND BACK FILL SHALL BE SELECTED FILL MATERIAL COMPACTED AS NOTED IN PROTECT ADJACENT WORK fROM CONTACT WITH MORTAR, ;;•
<br /> ANY ACT OR OMISSION OF THE CONTRACTOR,HIS SUBCONTRACTORS,SERVANTS,OR 7.CODES AND STANDARDS REQUIRED BY CODE ANDIOR INSURANGE COMPANIES,OR VERIFY THAT ONE IS EXISTING IN THE SOILS REPORT,GRADING PLAN AND EARTHWORK SPECIFICATIONS USE �
<br /> EMPLOYEES,INCLUDING ANY AND ALL EXPENSE,LEGAL OR OTHERWISE,WHICH MAY BE THE CASE OF REMODELING.DISCONNECT AND SEAL UTILITIES SERVING STRUCTURE TO NON-EXPANSION FILL MATERIAL AT BUILDING AREA AND UNDER WALKS.ALL C4MPACTION INSTALL AND CLEAN STONE IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS FOR ,
<br /> INCURRED BY PANDA EXPRESS,iTS AGENTS SERVANTS,OR EMPLOYEES IN THE DEFENSE ALL WORK,MATERIALS AND INSTALLATION SHALL BE IN STRICT ACCORDANCE WITH ALL BE DEMOLISHED,PRIOR TO START OF DEMOLITION WORK. SHALL BE SUPERVISED AND CERTIFIED BY A LICENSED SOILS ENGINEER AND STANDARD GROUTED INSTALLATION. -■
<br /> OF ANY CLAIM,SETTLEMENT OR SUIT. ORDINANCES,STATE AND LOCAL BUILDING CODES,LATEST EDITION,OF THE AUTHQRITIES CERTIFICATION REPORT SHALL BE SUBMITTED TO PANDA EXPRESS PRIOR TO PLACING OF ', 'f '1,��, .
<br /> HAVING JURISDICTION. 14.STRICTLY PROHIBITED WORK AND PRACTICES CONCRETE. MANUFACTURER'S FIELD SERVICE REPRESENTATIVE SHALL MAKE ONE SITE VISIT FOR .
<br /> A R T I C L E 3 E X T R A W O R K INSTALLATION INSPECTION AND CONSULTATION BEFORE MORE THAN 20%OF THE �
<br /> OESIGN LOADS: LOADS AND CODE RESTRICTIONS FOR ALL DESIGN CONSIDERATIONS INSTALLATION OF ANY CQMBUSTIBLE MATERIALS ABOVE FINISHED CEILINGS OR IN ANY 3.ASPHALT AND CQNCRETE PAVING MATERIAL IS INSTALLED, ��J/� /jArchitects & Planners
<br /> 1,ANY AND ALL WORK WHICH IS PERFORMED BY THE CONTRACTOR,OR BY ANY SHALL CONFORM TO THE LOCAL AND STATE CODES,AND ALL GOVERNING CODES, OTHER CONCEALED,NON-SPRINKLERED SPACE, L ►/1 Inc.
<br /> SUBCONTRACTOR,WITHOUT HAVING SPECIFIC APPROVAL FROM PANDA EXPRESS W (REFER TO CIVIL DRAWINGS FOR SPECIFICATIONS) ° ,P.,�,�y
<br /> WRITING,SHALL BE PERFORMED BY SAID CONTRACTOR AT HIS OWN RISK WITHOUT ANY 8.PERMITS IMPOSING ANY STRUCTURAL LOAD,TEMPORARY OR PERMANENT,ON ANY PART OF THE SEE GRADING AND PAVING PORTION OF SITE PREPARATION PROCEDURES ON THE SITE 3.CONCRETE MASONRY UNITS(CMU) ■
<br /> OBLIGATION OR RESPONSIBILITY OF PANDA EXPRESS OR THE ARCHITECT, ALL WORK WORK OR STRUCTURE WITHOUT APPROVAL, ANDIOR GRAQING PLAN.
<br /> WHICH IS ABOVE AND BEYOND THE SCOPE OF THE DRAWINGS AND SPECIFICATIONS,OR THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROPER APPLICATION FOR AND REFER TO STRUCTURAL DRAWINGS FOR CONCRETE MASONRY UNITS(CMU)
<br /> ANY PART OF THE CONSTRUCTION DOCUMENTS,MUST BE SPECIFICALLY AUTHORIZED BY SECURING OF ALL NECESSARY TRADE PERMITS,AS WELL AS THE OBSERVANCE OF ALL ATTACHING ANY WORK TO METAL DECK OR HANGING FROM PLUMBING AND SPRiNKLER MATERIALS: SPECIFICATIONS 5800 Stanford Rcrnch Roacl Suite 720
<br /> PANDA EXPRESS IN WRITING. ALL REQUESTS FOR ADDITIONAL PAYMENTS MUST BE APPLICABLE CITY,COUNTY,STATE AND FEDERAL LAWS,REGULATIONS OR ORDINANCES PIPING OR CONDUIT. 1)BASE COURSE; AS NOTED ON CIVIL DRAWINGS Rocklin, C'A 95765 �`:.
<br /> APPROVED BY THE OWNER PRIOR TO THE START OF THAT WORK. AND SHALL INCLUDE IN THEIR PROPOSAL COST OF SAME. 2)PRIME COAT; MG250 OR MC-70 PER ASPHALT INSTITUTE(ASTM D2027-76) phone: (916) ;�Sl-1500 - fax: (916) 451-1600
<br /> 15.POLLUTION CONTROLS 3}SURFACE COAT: AS NOTED ON CIVIL DRAWINGS �:
<br /> 2,THE FOLLOWING GENERAL REQUIREMENTS SUPPLEMENT ANDIOR SUPERSEDE THE 9,INSTALLATION OF MATERIALS AND EQUIPMENT 4)PAVEMENT MARKINGS,PARKING STALL STRIPES SNALL BE; AS NOTED ON CIVIL '
<br /> FOREGOING GENERAL AND SUPPLEMENTARY CONDITIONS FOR CONTRACT WORK AND USE WATER SPRINKLING,TEMPORARY ENCLOSURES,AND OTHER SUITABLE METHODS TO DRAWINGS
<br /> ARE HEREBY CONSIDERED A PART OF THE CONTRACT DOCUMENTS. ATTENTION IS HEREBY DIRECTED TO THE FOLLOWING REQUIREMENT FOR EACH PRIME LIMIT DUST AND DIRT RISING AND SCATTERED IN AIR TO LOWEST PRACTICAL LEVEL, 5)SEAL COAT: FOG-SEAL BY KOPPERS COMPANY. STAMP:
<br /> AND SUBCONTRACTOR:THAT THE APPLICATION OF A MATERIAL ANDIOR EQUIPMENT ITEM COMPLY WITH GOVERNING REGULATIONS PERTAINING TO ENVIRONMENTAL PROJECTION. 10501
<br /> TO UNSATISFACTORY WORK INSTALLED BY OTHERS,CONSTITUTES ACCEPTANCE OF THAT DO NOT USE WATER WHEN IT MAY CREATE HAZARDOUS OR OBJECTIONABLE CONDITIONS PROVIDE ALL ASPHALT AND CONCRETE WORK COMPLETE,AS SHOWN ON THE DRAWINGS RE G I S T E RED �
<br /> WORK AND ASSUMPTION OF FULL RESPONSIBILITY FOR PRIOR TO STARTING THE SPECIFIC SUCH AS ICE,FLOODING AND POLLUTION. HEREIN SPECIFIED,INCLUDING CONCRETE FORM WORK,REINFORCEMENT DOWELS AND ARCH I T E CT
<br /> APPLICATION,NOTIFY IN WRITING THE ARCHITECT ANDIOR OWNER'S REPRESENTATIVE OF ACCESSORIES,CONCRETE MIXED,PLACE,FINISHED AND CURED.
<br /> ANY dEFECT OR DEFICIENCY WHICH WOULD IMPAIR COMPIETE AND SATISFACTORY CLEAN ADJACENT STRUCTURES AND IMPROVEMENTS OF DUST,DIRT AND DEBRIS CAUSED �C`.�.
<br /> APPLICATIONS OR INSTALLATION OF HIS WORK OR GUARANTEE. BY DEMOLITION OPERATIONS,AS DIREGTED BY ARCHITECT OR GOVERNING AUTHORITIES. EXTERIOR WALKS AND RAMPS TO BE LIGHT BROOM TEXTURE FINISH,UNLESS NOTED
<br /> RETURN ADJACENT AREAS TO CONDITION EXISTING PRIOR TO START OF WORK, OTHERWISE. Ervin Edmund McMutten
<br /> MANUFACTURER'SINSTRUCTIONS; STATE OF WASHINGTON
<br /> WHERE INSTALLATIONS INCLUDE MANUFACTURED PRODUCTS,COMPLY WITH 16.TURNOVER REQUIREMENTS EXTERIOR FLATWORK AND CURBS-PROVIDE EXPANSION CONTRACTION JOINT AT 20'-0"
<br /> MANUFACTURER'S APPLICABLE INSTRUGTIONS AND RECOMMENDATIONS FOR ON CENTER MAXIMUM AND CONTROL JOINT AT 5'-0"ON CENTER MAXIMUM,
<br /> INSTALLATION,70 THE EXTENT THESE ARE MORE EXPLICIT OR MORE STRINGENT THAN 1.THE CONTRACTOR SHALL ARRANGE FOR ALL INSPECTIONS AND FURNISH OWNERS
<br /> REQUIREMENTS INDICATED IN THE CQNTRACT DOCUMENTS, REPRESENTATIVE WITH THE CERTIFICATE OF OCCUPANCY, G.C,IS ALSO TO PROVIDE A q,TERMITE CONTROL "
<br /> TYPEWRITTEN LIST OF NAMES,AQDRESSES AND PHONE NUMBERS OF ALL
<br /> PROVIDE ATTACHMENT AND CONNECTIQN DEVICES AND METHODS FOR SECURING WORK SUB-CONTRACTORS AND MATERIAL SUPPLIERS. �
<br /> PROPERLY AS IT IS INSTALLED;TRUE TO LINE AND LEVEL,AND WITHIN RECOGNIZED QUALITY ASSURANCE:CONFORM TO STATE,LOCAL,AND ALL OTHER C FT P LAZA �
<br /> INDUSTRY TOLERANCES IF NOT OTHERWISE INDICATED. ALLOW FOR EXPANSIONS AND 2,THE CONTRACTOR SHALL BE RESPONSIBLE FOR HAVING THE ENTIRE STORE CLEAN AND REGULATIONS FOR THE USE AND APPLICATION OF TOXICANT CHEMICALS.
<br /> BUILDING MOVEMENTS. SPOTLESS AT THE TIME OF FURNITURE INSTALLATION AND AT TURN OVER. APPLICATOR SHALL BE A COMPANY SPECIALIZING IN SOIL TREATMENT FOR E V E RG R E E N WAY
<br /> TERMITE CONTROL WITH FIVE YEARS EXPERIENCE ANQ LICENSED FOR PROJECT
<br /> VISUAL EFFECT: 3.PRIOR TO THE STORE OPENING,CONTRACTOR IS TO ARRANGE FOR AN INDEPENDENT IOCATION.SUBMIT COMPLETE PRODUCT DATA AND MANUFACTURER'S
<br /> PROVIDE UNIFORM JOINT WIDTHS IN EXPOSED WORK,ORGANIZED FOR BEST POSSIBLE BALANCING CONTRACTOR TO BALANCE THE HVAC SYSTEM AND PROVIDE A COPY OF THE INSTRUCTIONS.INDICATE CAUTION REQUIREMENTS. EVERGREEN INAY& CASINO ROAD
<br /> VISUAL EFFECT. REFER QUESTIONABLE VISUAL-EFFECT CHOICES TO BAIANCING REPORT TO OWNER'S REPRESENTATIVE, WARRANTY:FURNISH FIVE YEAR WARRANTY AGAINST INVASION QR EVERETT, WA 9HZOH
<br /> ARCHITECTIOWNER'S REPRESENTATIVE FOR FINAL DECISION. RECHECK MEASUREMENTS PROPAGATION OF SUBTERRANEAN TERMITES,DAMAGE TO BUILDING OR '
<br /> ANQ DIMENSIONS OF THE WORK,AS AN INTEGRAL STEP OF STARTING EACH 4.CONTRACTOR TO TURN OVER ALL KEYS TO THE OWNER'S REPRESENTATIVE AND CONTENTS CAUSED BY TERMITES. INCLUDE COST FOR REPAIRS TO BUILDINGS
<br /> INSTALLATION. MARKING EACH KEY FOR IDENTIFICATION.THE CONTRACTOR SHALL SET ALL TIME OR CONTENTS SO CAUSED. ''°�
<br /> CLOCKS,THERMOSTATS,ETC,PER OWNER'S REPRESENTATIVE�s REQu�REMENTs. DT END CAP TENANT IMPROVEMENT
<br /> MOUNTING HEIGHTS: PRODUCTS:PROVIDE WATER EMULSION MATERIALS MANUFACTURED BY ONE OF
<br /> WHERE MOUNTING HEIGHTS ARE NOT INDICATED,MOUNT INDIVIDUAL UNITS OF WORK AT 5,THE CONTRACTOR SHALL EXPLAIN THE OPERATION OF ALL MECHANICAL SYSTEMS TO THE FOLLOWING:BASE TERMIDOR;DOW AGRO SCIENCES EQUITY 1.0 PERCENT; �+ .
<br /> INDUSTRY-RECOGNIZED STANDARD MQUNTING HEIGHTS FOR APPLICATIONS INDICATED. THE OWNER'S REPRESENTATIVE AND PROVIDING COPIES OF OPERATION,MAINTENANCE OR OTHER PRODUCT SUBSTITUTIONS IF APPROVED IN WRITING BY PANDA. :
<br /> REFER QUESTIONABLE MOUNTING HEIGHT CHOICES TO ARCHITECT/OWNER'S AND WARRANTY MANUALS.
<br /> REPRESENTATIVE FOR FINAL DECISION.CONFORM WITH APPLICABLE ACCESSIBILITY EXECUTION:VERIFY EXISTING CONDITIONS BEFORE STARTING WORK.APPLY IN
<br /> CODES WHERE REQUIRED, ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS,STATE AND
<br /> FEDERAL LAWS AND OSHA REGULATIONS.COORDINATE INSTALLATION WITH
<br /> ROUGH GRADWG TO AVOID DISTURBANCES TO TREATE�SOIL.RETREAT ANY �
<br /> DISTURBED SOIL DO NOT PERMIT SOIL GRADWG OVER COMPLETED WORK.
<br /> TREATMEN7 SCHEDULE:TREAT SOIL AT THE FOLLOWING LOCATIONS:
<br /> UNDER FOOTINGS;UNDER SLABS ON GRADE;BOTH SIDES OF FOUNDATION SPECIFICATIONS
<br /> WALLS;AND SOIL WITHIN 10 FEET OF BUILDING PERIMETER FOR A DEPTH AS
<br /> RECOMMENDED BY THE MANUFACTURER FOR THE REGION WHERE PROJECT IS '�;��� �� ������� it•
<br /> LOCATED. ,
<br /> �������� ��� �����
<br /> �
<br /> PLANCHECK SUBMITTAL DWGS
<br />
|