Laserfiche WebLink
GEI� �RAL PLUMBING NOTES - PLUMBING KEY NOTES 3 4 <br /> O <br /> A FOOD SERVICE EQUIPMENT: ft�FER TO OTHER PORTIONS OF PIANS AND SPECIFlCATIONS FOR FURTHER ;:� <br /> INFORMATION ABaUT FOOD SERVICE ITEMS FURNISHED AND WORK PERFORMED BY OTHERS, VERIFY ROUGH-IN 1. �� G DOWN TO WATER HEATER W/ SOV (SHUT OFF VALVE). . � <br /> REQUIREMENTS WITH EQUIPMENT FURNISHED. � � ;, <br /> 6. HEALTH DEPARTMENT; COMPLY WITH LOCAL HEALTH DEPARTMENT (HD) REGULATIONS.WHEREVER POSSIBLE, INSTALL 2. �" G DOWN TO RICE COOKER W/ SOV. PROVIDE 6" LENGTH OF RIGID PIPE BEfWEEN RICE � � � <br /> ALL PIPING CONCEALED. CONFORM TO HD REQUIREMENTS FOR LOCATIONS OF FLOOR SINKS. . COOKER AND FLEXIBLE GAS L{NE. <br /> C. WORKMANSHIP SHALL BE FIRST CLASS, ACCEPTABLE TO OWNER. � <br /> D. MAKE COMPLEfE: PR041DE ITEMS AND WORK AS REQUIRED TO COMPLEfE THE INSTAl1A?ION OF PLUMBING 3. CW SHUT OFF BALL VALVE LOCATED WITHIN .WALL AT 24" AFF. REFER TO ARCHITECTURAL � <br /> SYSTEMS TO FlXTURES AND EQUIPMENT: TRAPS, STRAINERS, GAUGES, GAS AND WATER PRESSURE REGULATORS, ORAWINGS FOR ACCESS PANEL DEfAIL � � <br /> FLEXIBLE CONNECTIONS, STOP VALVES, UNIONS, EfC. PROVIDE AND CONNECT PLUMBING PIPE FROM ROUGH-INS I I • +� <br /> TO ITEMS AS SHOWN, SPECIFlED AND REQUIRED. 4. �" G DOWN TO DEEP FRYER W/ SOV. � � , <br /> E. VERIFY LOCATIONS: EXISIING PIPING, POC SHOWN ON DRAWINGS HAS BEEN LOCATED FROM INFORMATION <br /> PROVIDED BY OTHERS. VERIFY EXACT LOCATION ON JOB SITE BEFORE START WORKING. 5. �" G DOWN TO CHINESE RANGE "20A OR 20B" W/ SOV. LOCATE STUB OUT BEHIND THE END j � <br /> F. BACKFLOW PREVENTION: PROVIDE BACKFLOW PREVENTERS (BFP) IN WATER LJNES ONLY IF REQUIRED BY LOCAL OF RANGE FOR EASY ACCESS. I � �' <br /> AUTHORITIES. USE DEVICES OF TYPE (VACUUM BREAKER, DOUBLE CHECK, REDUCED PRESSURE) AND I � � <br /> MANUFACTURER APPROVED BY LOCAL AUTHORITIES, ONLY IN LOCATIONS REQUIRED. 6. 1" G DOWN TO CHINESE RANGE "20Q" W/ SOV. � +_� <br /> G. RESTROOM TRAP PRIMERS: SOUIX CHIEF "TRAP EASE" MODEL 200-090 TRAP PRIMER TAILPIECE. PROVIDE A ' - - � , <br /> CONTINUOUS LENGTH OF Y" SOFf COPPER TUBE FROM PRIMER TO TRAP, SLOPING TO TRAP. PROVIDE 7. EXHAUST & INTAKE VENTS UP TO ROOF. COORDINATE WITH MECHANICAL DR,4WINGS AND DETAIL n � <br /> 0 0 . ,� <br /> ELASTOMERIC INSULATION ON PIPE INSTALIED BELOW FLOOR SLAB. SEE DEfAIL #9 ON SHEEf P-500. #10 ON SHEEf P-500. , " � <br /> H. WATER CONSERVATION: CONTRACTOR SHALL PROVIDE WATER FLOW LJMITING FEATURES ON FlXTURES IF/AS C12 1/2"CW& ; <br /> REQUIRED BY LOCAL AUTHORITIES. 8. ROUTE NE1N PIPING IN WALL. B � 6� � , O O PANDA EXPRESS, INC. <br /> I. COLD WATER: CONNECT TO DOMESTIC COLD WATER VALVED STUB. EXTEND COLD WATER PIPE, SUSPENDED FROM „ O � ' 1683 Walnut Grove Ave. . <br /> STRUCTURE ABOVE CEILING AND DOWN IN PARTITIONS, TO SERVE FlXTURES AND EQUIPMENT. 9. 2 GAS ANSUL VALVE PROVIDED BY OWNER (G.C. CALL CAPITIVEAIRE FOR DELIVERY). INSTALI /2"�W � <br /> J. HOT WATER: PROViDE COMMERCIAL TYPE WATER HEATER, DESIGN PER PLAN. RUN HOT WATER PIPE, SUSPENDED GAS ANSUL VALVE AS CLOSE TO EXiERIOR WALL AS ALLOWED PER LOCAL CoDE. O ��� ° ° � Rosemead, California <br /> FROM STRUCTURE ABOVE CEILJNG AND DOWN IN PARTITIONS TO SERVE FlXTURE AND EQUIPMENT. A � �3 91770 <br /> K, SANITARY: CONNECT TO SANITARY WASTE LINE. 10. 1 CW SUPPLY Ta P2 (WH1) REFER TO DEfAIL 5/P-400. Telephone:626.799.9898 <br /> L BRANCHES: PROVIDE HOT AND/OR COLD WATER PIPES DOWN IN PARTf110N TO SERVE VARIOUS EQUIPMENT PER i I Facsimile:626.372.8288 <br /> "KITCHEN EQUIPMENT SCHEDU�E°. 11. 1" G UP TO ROOF W/ SOV. FOR ROOFfOP UNITS: NOTES. <br /> M. SODA CONDUIT: PROVIDE 4" CONDUIT BELOW FLOOR FROM SODA STORAGE TO SODA DISPENSER. i • ' <br /> ' - - - - N. CONDENSATE: PROVIDE 1" INSULATED PRIMARY AND SECONDARY CONDENSATE DRAIN-PIPES-FROM FAN-COIL UN�T �12.-Y�CW TO TRAP PRIMER. PROVIDE WALL ACCESS-PANEL. RUN Y`' CW BELOW FLOOR TO FLOOR - - - -- -- - -- -- - - - i- ---- - - - <br /> I --- ----- --- . --- -- -- _ __ .- - _ _ _-- ----- --- - --- --- - . <br /> 1. � ALL WATER LWES SERVING WATER HEATEf�S � o , ' <br /> ABOVE CEILING TO NEAREST FLOOR SINK. DRAIN, SEE DEfAIL #17 ON PLAN P-500. SHALL RUN DOWN FROM CEILING SPACE IN All itleas,designs,arrangement and plans indicated or L <br /> 0. GAS SERVICE: PROVIDE A1.L PIPES, VALVES AND CONNECTiON TO GAS MEfER. FOR NATURAL GAS SERVICE, n WALL,OFFSET OVER THROUGH WALL 6" I I I � •0 � represented by this drawing are the property of Panda • <br /> COORDINATE WITH GAS UTILITY COMPANY FOR MEfER REQUIREMENTS, PERMITS AND FEES. ROUTE PIPE AS 13. LAV. TAILPIECE WITH TRAP PRIMER, RUN Y CW BELOW FLOOR TO FLOOR DRAIN, SEE DEfAIL #9 BELOW CEILING,ABOVE WATER HEATER, � � � Express Inc.and were createtl for use on this specific project. <br /> REQUIRED, SUSPENDED FROM STRUCTURE ABOVE. USE ALL WELDED PIPE, FlTTINGS, AND JOINTS IN CEILING SPACE ON PIAN P-500. THEN DROP DOWN TO HEATER. I I � � � I ° None of these ideas,designs,arrangements or plans may be <br /> AND IN WALL AS PER LOCAL CODE. I I � � usetl by or disclosed to any person,firm,or corporation <br /> P. INDIRECT DRAIN: AN NR GAP TWICE THE SIZE OF THE DRAIN LJNE MUST BE PROVIDED BETWEEN THE DRAIN LINE 14. NOT USED 2. AVOID RUNNING WATER VALVES DIRECTLY � � � I I i J without the written permission of Panda Express Inc. ' <br /> AND THE SANITARY SEWER. ABOVE WATER HEATER,TO AVOID DAMAGE � I I � <br /> Q. LJQUID WASTE FROM ALL EQUIPMENT MUST BE DISCHARGED TO THE SANITARY SEWER, 15. SHUT OFF VALVE W/ HANDLE AT 11'-0" ABOVE FlNISH FLOOR, EASILY ACCESSIBLE. G.C. TO TO WATER HEATER CAUSED BY POSSIBLE � I ❑ � a � <br /> R. .FLOOR DRAIN MUST BE PLACED ADJACENT TO EQl11PMENT WHICH DISCHARGES WASTE. FLOOR DRAIN INSTALLATION INSTALL LOCAl10N INDICATOR STICKER PROVIDED BY PANDA D(PRESS LEAKS. ---- � a - <br /> MUST NOT INTERFERE WITH PROPER FLOOR MAINTENANCE. 0 I � <br /> S. IXPOSED Uf1lJTY LJNES ON FLdORS ARE PROHIBITED. UTILJTY L1NES MUST NOT BE UNNECESSARILY IXPOSED ON �6. �� GAS UP TO MAKE-UP AIR UNIT ON ROOF. 3. REFER TO PIPING RISER DIAGRAMS,SHEET � REVISIONS: <br /> T. ALL WATER AND GAS CONNECTIONS TO ALL PLUMBING FlXTURES TO BE HARD PIPED. NO FLEX PIPE. „ P-400 FOR ALL PIPE SIZING NOT SHOWN ON � ( m � . . ° Health De t.PC#1 06/15/18 VK/VZ <br /> 1 7. Y z H W & C W T O F A U C E f (4 0 6) F O R C H E M I C A L F E E D S Y S T E M. F L O O R P L A N. I � p <br /> U. ALL PIPES 6" A.F.F. NO FLOOR SUPPORTS ALI.OWED. i � � Q Building Dept.PC#1 08/07/18 VK/VZ 'S� <br /> V. ALL WATER PIPES IN EXPOSED AREAS OUTSIDE WALLS AND BELOW CEILING MUST BE COPPER UNLESS NOTED �g. � HEADER - INSTALL T1GHT TO WALL AND TIGHT TO BOTfOM OF TRUSSES. 4. DO NOT RUN ANY PIPING HORIZONTAL IN , 13 � Q > <br /> �THERW�SE. n � WALL SPACE,U.N.O. 1/2"CW �� `` � ° � Bldg.Depf.PC#2 01l14/19 VZ I� " <br /> Panda Modifications 11/20/18 VK <br /> 19. COLD WATER MANIFOLD C BELOW CEIIJNG. REF ARCH ELEVATIONS q� \ <br /> 5. REFER TO RISER DIAGRAMS,SHEET P-400 � <br /> P L U M B I N G S P E C I F I C A T I 0 N S 20. COLD WATER MANIFOLD "D" BELOW CEILING. REF ARCH ELEVATIONS 5 1/2°CW& 4o I 0 <br /> 1. WORK INCLUDES CONNECTION OF PLUMBING UTILJTIES TO DEVELOPER OR LANDLORD'S UTILJTIES AND 21. NOT USED O � � <br /> i <br /> INSTALLATION OF A COMPLETE PLUMBING SYSTEM WITHIN SPACE. PROVIDE NEW MATERIALS, FlTfINGS, 112"CW UP TO"0"ROOF i I � - <br /> ACCESSORIES, FlXTURES AND EQUIPMENT NECESSARY FOR A COMPLEfE AND PROPERLY FUNCTIONING SYSTEM AS 22. HOT WATER MANIFOLD "A" BELOW CEILING. REF ARCH ELEVAl10NS ITYDRANT,LOCATE PER <br /> SHOWN ON PLANS AND AS REQUIRED. WORK INCLUDES FlNAL CONNECTIONS TO EQUIPMENT AND FIXTURES I <br /> OWNER REQUIREMENTS � i <br /> PROVIDED BY OTHERS. FURNISH ALL NEW MATERIALS. WORK SHAL.L BE PERFORMED BY EXPERIENCED 23. ORIENTATION OF WATER HEATER CONTROL PANEL TO MATCH IMAGE SHOWN ON PLANS. DO NOT � I � o ISSUE DATE: <br /> TRADESMEN, AND THEIR WORKMANSHIP SHALI. BE HIGH STANDARD, ACCEPTABLE TO OWNER. TURN WATER HEATER ON 45 DEGREE ANGLE. I � I <br /> 2. CODES: All WORK SHALL BE IN ACCORDANCE WITH LOCAL CODES, SAFEfY REGULATIONS, OR ORDINANCES. PAY N gp 0 <br /> FOR ANY PERMITS REQUIRED, AND CALL FOR ANY REQUIRED INSPECTIONS TO BE MADE BY LOCAL AUTHORITIES. I I ';. <br /> 3. INTENT OF DRAWINGS IS TO INDICATE GENERAL EXTENT OF WORK REQUIRED FOR PROJECT. DRAWINGS FOR 1/2+24" I � I ' <br /> PLUMBING WORK ARE DIAGRAMMATIC, SHOWING GENERAL LOCATION, TYPE, PIPING, FlXTURES AND EQUIPMENT � @ � ° '`' . <br /> REQUIRED. PROVIDE ALL FlTTINGS, ACCESSORIES, OFFSEfS, AND MATERIALS NECESSARY TO FULFlLL INTENT OF D6 - D7 � � I • <br /> PLANS. DRAWINGS SHALL NOT BE SCALED FOR EXACT MEASUREMENTS. USE DIMENSIONED ARCHITECTURAL � I � <br /> DRAWINGS. RFFER TO MANUFACTURER'S STANDARD ROUGH-IN DRAWINGS FOR PLUMBING FlXTURES, AND TO o I � <br /> ARCHfTECTURAL DRAWINGS FOR IXACT LOCATIONS. D I � I . <br /> 4. FSE ROUGH-IN DRAWINGS: REFER TO ROUGH-IN DRAWINGS FURNISHED BY THE FOOD SERVICE EQUIPMENT N 10J � <br /> SUPPIJER, FOR EXACT LOCATION OF WATER PIPING SUPPLIES AND DRAIN LOCATIONS TO SERVE FOOD SERVICE <br /> L------ ------------------------------------------ <br /> 5. COORDINATE WITH WO KY OF OTFIER SEC OINSSANDOTf��DESa WITHUEQU PMENTGFURNISHED BY OTHERS, AND WITH P L U M B I N G S Y M B O LS _ _ _ _ _ B • <br /> CONSTRAINTS OF IXISTING CONDITIONS OF PROJECT SITE. - - - COLD WATER PIPING ❑ � n <br /> . , .: ; , ,.. <br /> 6. MISCELLANEOUS IXPENSES SUCH AS HOOK-UP CHARGES, PERMITS, INSPECTIONS, AND OTHER IXPENSES � OOO OO OO �JO OO OO OO <br /> RELATED TO A COMPLEfE AND FUNC110NING SYSTEM ARE INCLUDED AS PART OF THIS SECTION. ' � DRAWN BY: LMR ENGINEERS <br /> - HOTWATERPIPING � ------------ ----------� <br /> 7. PIPING SYSTEMS. GENERAL: ALL PIPING SHALL BE RUN PARALLEL TO BUILDING LINES AND SUPPORTED AND �� �- � I I - <br /> ANCHORED AS REQUIRED TO FACIIJTATE IXPANSION AND CONTRACTION. ALL PIPING SHALL BE CONCEALED I I ' . � <br /> EXCEPT IN UNFINISHED SPACES. INSTAL.L AS REQUIRED TO MEEf ALL CONSTRUCTION CONDITIONS AND TO ALLOW G GAS LINE � � � O <br /> FOR INSTALLATION OF OTHER WORK INCLUDING DUCTS AND ELECTRICAL CONDUIT. AT ALL CONNECTIONS � � " � <br /> BEfWEEN FERROUS PIPING AND NONFERROUS PIPING, PROVIDE AN ISOLATING DIELECTRIC UNION. SEAL PIPE --------------- PLUMBING VENT(V) � � _____________� PANDA PROJECT#: S5-19-D5892 <br /> PENETRATIONS OF F1RE FLOORS AND FlREWALLS WITH FIREPROOF PUTTY OR GROUT. PROVIDE SUMNER OR � �------- � <br /> �------- �------------------------�- ------- LMR PROJECT#: 1891 � <br /> EQUIVALENT PIPE HANGING SYSTEM IN CHASES, PROVIDE HANGERS AS RECOMMENDED BY HANGER PLUMBING VENT(V) � <br /> MANUFACTURER AND MSS-SP-58, 69 AND 89, FU BELOW SLAB/GRADE � 1!2"CW&H f <br /> 8. WASTE PIPING: PROVIDE ALL DRAIN, WASTE AND SEWER PIPING WITHIN PROJECT SPACE WITH CONNECTION TO - -- ---�-- -- ---� <br /> SANITARY WASTE SYSTEM ON SITE. PROVIDE A COMPLEfE SYSTEM OF WASTE PIPING, CONSISTING OF SCH 40 SANITARY WASTE(SAN) - " " "� ' <br /> PVC PIPE, CONNECTORS AND RTfINGS ALL PIPING SHALL BE SLOPED UNIFORMLY AT 2% UNLESS OTHERWISE � BE�OW SLAB/GRADE 47 0� � � � <br /> REQUIRED BY IXISTING CONDITIONS. , _ - <br /> 8.1. CLEANOUTS SHALL BE INSTALLED IN ALL HORIZONTAL DRAINAGE PIPE AND SHALL BE LOCATED NOT MORE �-�O �' � PIPE TURNING UP/DOWN 1/2"CW,3/4"HW&HW 1/2'CW&HW <br /> THAN 100 Fi� APART. BELOW FLOOR I I I I I I I I I I I I I l.l�l.J l l,�l l I I I I I I I I I I I I I I I I <br /> 8.2. CLEANOUTS SHALL BE INSTALLED AT ALL CHANGES OF DIRECTiON GREATER THAN 45 DEGREES. WHERE ' , ����As r"L S �12��cw <br /> MORE THAN ONE CHANGE OF DIRECTION OCCURS IN A SINGLE PIPE RUN, ONLY ONE (1) CLEANOUT GAS COCK 1-1I2��GAs �2"�W ' ' 2oQ 21G 25a 20A N 9D AY�chitects c� Plccnnc�s . <br /> SHALL BE REQUIRED FOR EVERY 40 FEET OF DEVELOPED LENGTH zoa � , 2aQ � c Inc. <br /> 9. VEHTS: PROVIDE A COMPLETE SYSTEM OF VENT PIPING CONSISTING OF SCH 40 PVC PIPE CONNECTORS AND � � � I 8 6 4 8 2 8 g � 0 1l2"CW • <br /> � � 8 5 8 I � 18 � <br /> @ �� <br /> F1TiINGS. COMBINE THE VENT RISERS IN THE CEIIJNG SPACE. CONNECT TO D(IS11NG VENT MAIN. � F.S.WITH HALF GRATE � O � _ � o � +24 � <br /> 10. WATER PIPING. CONNECT TO D(ISTING WATER PIPING AND PROVIDE A NEW DOMESIIC HOT AND COLD WATER O N � _ � <br /> PIPING SYSTEM INSIDE THE BUILOING AS SHOWN ON DRAWINGS. LAY OUT WATER PIPING SO THAT EM1RE � m = � • <br /> � � � C6 � �' � � m 5800 Stanforcl Ra�ech Roacl Suite 720 <br /> SYSTEM CAN BE DRAINED. HOT AND COID WATER PIPING SHALL BE PEX WITH ZURN PEX PRE-ASSEMBLED � ' FLOOR DRAIN � , � C� C1 � <br /> _ � FD g � � � � Rocklin, CA 95765 � <br /> MANIFOLDS. PD( PIPING SHALL BE CONTINUOUS FROM MANIFOLD CONNECTION TO COPPER STUB OUT AT EACH <br /> FIXTURE. PEX PIPING SHALL NOT BE SPLICED WITHIN WAIJ_S. PROVIDE WATER HAMMER ARRESTERS AT RESTROOM 2"GASANSUL ° + ° ' phone: (916) 451-1500 - f'ax: (91F) �SI-1600 <br /> AREA & CHINESE WOK AREA PER DRAWING SHOWN. FLUSH WATER PIPING CLEAR OF DEBRIS AND CLEAN OA FIXTURE IDENTIFICATION VALVE ABOVE '. <br /> AERATORS AND STRAINERS AT TERMINATION OF INSTALLATION. CEILING <br /> 11. NATURAL GAS PIPING INSIDE AND OUTSIDE THE BUILDING ABOVE GRADE SHALI. BE SCHEDULE 40 BLACK STEEL G ' � � 10J � <br /> ASTM A-33 PIPE WITH 125 LB MALLEABLE IRON SCREWED FlTf1NGS WHERE IXPOSED. PRIMER AND PAINT O PLAN NOTE 15 A1 � ' D4 I/ W HW �03 � � STAMP: <br /> EXTERIOR GAS PIPING TO PREVENT RUST. PROVIDE ALL UNIONS, SHUT OFF VALVES AND DRIP LEGS REQUIRED � f ������� <br /> . ��•.: . <br /> BY NFPA-54 AND GOVERNING CODES. PROVIDE ALL TESTS, INSPECTIONS, HANGERS AND APPURTENANCES O i 17 40B O i � . O �°� � � <br /> � KITCHEN EQUIPMENT IDENTIFICATION � i 40A 41B �3� � ��: A " � <br /> REQUIRED FOR A COMPLEfE OPERATING SYSTEM. TAP ON UTIIJTY GAS MA1N AND GAS METER SHALL BE BY GAS i 1/2"CW&HW 12 � K 1/2"CW ���� � � <br /> � 1/2"CW&HW <� ��`� ` < <br /> COMPANY. EXTEND PIPING FROM MEfER TO EQUIPMEM AS DETAILED ON DRAWINGS. PROVIDE ROUTING, HANGING, + - <br /> AND PENETRATIONS PER OWNER�S REQUIREMENTS. VTR ' VENT THRU ROOF �-- -_ _ _ _ � _ �� _ _ _ � 4F � � � <br /> -- - - -- -- -- -- -- � r". �� <br /> 12. PIPE INSUlATION: INSUTATE ALL. COLD WATER AND CONDENSATE PIPING WITH Y2", AND HOT WATER PIPING WITH � . � � �;° ` ��� <br /> 1", PREFORMED FIBERGLASS WITH ALL-SERVICE JACKET WITH VAPOR BARRIER (BY CT, OC, JM, PPG, OR AFFIAFG ABOVE FINISHED FLOOR/GRADE -- - � P1 ��� _~ ' R�� . <br /> 2"G,CTE,FOR <br /> KNAUF). AT CONTRACTOR'S OPTION, PLENUM-RATED ELASTOMERIC INSULATION (BY ARMSTRONG, RUBATEX OR CONTINUATION SEE -- - � ---- 1/2"C HW ^ <br /> r�<Pi�"�'e� � �,� , ��i��� <br /> EQUAL� MAY 8E USED. CO CLEANOUT SHELL BUILDWG � `_..,,., �. W�, ��o....� <br /> 13. PIPE MARKING: DRAWINGS �2 P3 , <br /> 13.1. IDEMIFY ALL PIPING WITH ANSI/ASME A13.1 2007 APPROVED PIPE MARKER SYSTEM USING Q ARROWS WCO WALL CLEANOUT � ; <br /> AND ARROW BANDING TAPE IN CONJUNCTION WITH EZ PIPE MARKERS. PRODUCTS AVAILABLE AT � <br /> PIPEMARKER.COM. 822-274-6271. INSTALL PER MANUFACTURERS INSiRUCTIONS. FCO FGCO FLUSH FLOORIGRADE CLEANOUT CONTI U TIONF�E 3 � ' . �� � 112"CW <br /> 13.2. IDENIIFY ALL MANIFOLDS AND ALL VALVES ON THE MANIFOLDS FOR CORRESPONDING FIXTURES. SHELL BUILDING � � C FT P LAZA <br /> 14. SHUT-OFF VALVES WITH UNIONS SHALL BE PROVIDED AT BRANCHES TO GROUPS OF MORE THAN PNO FlXTURES, DRAWINGS i 19 20 22 ,i. <br /> AND.AT THE WATER HEATER, TO FACILITATE ISOLATION FOR REPAIR OR REPLACEMENT. USE CHROME-FlNISHED � FPC � FIRE PROTECTION CONTRACTOR - EV�I���E�� UiI,AY � <br /> FORGED BRONZE BODY BALL VALVE, WITH TEFLON SEATS AND PACKING, 400 LB WOG, WITH SOLDER ENDS, - - - - - 10 <br /> EQUAL TO JENKINS �902-T. GAS VALVES SHALL BE ALL BRONZE LUBRICATED PLUG COCKS FOR SCREWED PIPE, DNR DEPARTMENT OF NATURAL RESOURCES ' - <br /> BY WALWORTH, ROCKWELL, NORDSTROM OR APPROVED EQUIVALENT. EVERGREEN WAY & CASINO ROAD <br /> 15. ACCESS PANELS SHALL 8E PROVIDED IN CEILINGS OR WALLS WHERE CONCEALED CONTROL DEVICES ARE TYP TYPICAL - - - - - - - - - - - - - - - - - - - - - - PZ 23 EVERETT, WA 98208 <br /> LOCATED, EXCEPT WHERE ACCESS FOR AUJUSTMENT AND MAINTENANCE IS POSSIBLE TNROUGH LAY-IN CEILJNGS. - 1-112"CW&HW <br /> 16. SUPPLJES AND TRAPS: PROVIDE WATER SEALED TRAPS AND SUPPLJES INSTALLED AS CLOSE AS POSSIBLE TO ' � <br /> ALL PLUMBING FlXTURES, DRAINS, AND FOOD SERVICE EQUIPMENT OR BEVERAGE DISPENSING EQUIPMENT ITEMS (E) EXISTWG CP <br /> FURNISHED BY OTNERS, HAVING A WASTE CONNEC110N, OR REQUIRING WATER SERVICE. DCPOSED TRAPS ,4No DT END CAP TENANT IMPROVEMENT <br /> SUPPLJES IN EXPOSED AREAS (INCLUDING CABINEf INTERIORS) SHALL BE CHROME PLATED BRASS. � POINT OF CONNECTION <br /> 17. INSTALlATION: THOROUGHLY CLEAN ITEMS BEFORE INSTAL1Al10N. CAP PIPE OPENINGS TO D(CLUDE DIRT UNTIL � <br /> FIXTURES ARE INSTAIJ_ED AND FINAL CONNECTIONS HAVE BEEN MADE. PROCEED AS RAPIDLY AS CONSTRUCTION �_gV BALL VALVE <br /> WILL PERMIT. SEf FIXTURES LEVEL AND IN PROPER ALIGNMENT. INSTALL SUPPLJES IN PROPER ALIGNMENT . <br /> WITH F1XfURES, PER MANUFACTURER'S ROUGH-IN DIMENSIONS. INSTALL SILICONE SEALANT BEfWEEN FIXTURES -�}-CV CHECK VALVE ' '3� <br /> AND ADJACENT MATERIAL, FOR SANITARY JOINT. REPAIR ANY DAMAGE DONE TO D(ISTING FEATURES AND � <br /> RESTORE TO ORIGINAL CONDITIONS. PROVIDE CLEAN CONDITIONS AT TERMINAl10N OF WORK. GS GREASE WASTE , " <br /> 18. TEST WATER, GAS, VENT, AND WASTE SYSTEMS PER LOCAL CODE REQUIREMENTS. WHEN TESTING INDICATES � ' <br /> MATERIALS aR WORKMANSHIP ARE DEFICIENT, REPLACE OR REPAIR AS REQUIRED, AND REPEAT TEST TILL � <br /> STANDARDS ARE ACHIEVED. � <br /> 19. GUARANTEE THE WORK AND THE INSTALLATION FOR ONE YEAR AFTER FORMAL ACCEPTANCE BY THE OWNER. � �d 1��/U� <br /> 20. ALL SAW CUT AND PATCH BACK OF FLOOR TO MATCH D(ISTING FlNISHES. BACKFlLL PER DEVELOPER OR ` <br /> OWNER� SOILS ENGINEER'S RECOMMENDATIONS . CONSULTING MECHANICAL ENGINEERS WATER & GAS PLAN <br /> . 1165 A STREET HAYWARD, CA 94541 ' <br /> � TEL. (510) 733-2330 FAX. (510)733-0332 <br /> WWW.LMRENGINEERS.COM <br /> � PLANCHECK SUBMITTAL DWGS 1891 :. <br /> '.j' <br />