My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Constuction Inc 5/4/2020 Change Order 23
>
Contracts
>
Capital Contract
>
Interwest Constuction Inc 5/4/2020 Change Order 23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2020 10:58:23 AM
Creation date
5/27/2020 10:58:13 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Constuction Inc
Approval Date
5/4/2020
Department
Public Works
Department Project Manager
Heather Griffin
Subject / Project Title
Grand Avenue Park Bridge
Public Works WO Number
PW3588
Amendment/Change Order
Change Order
Amendment/Change Order Number
23
Tracking Number
0000801
Total Compensation
$7,758.70
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction Inc. 7/24/2017
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project: Grand Avenue Park Bridge <br /> Change Order No.: 23 <br /> Change Order Effective Date: 4-17-2019 <br /> CONTRACTOR <br /> By <br /> Officer Date: 4/20/2020 <br /> Exhibit A—Description of Changed Work <br /> Striping of WMVD and W. Parking Lot: <br /> • Additional striping has been added to the contract on W. Marine View Drive to the North of the <br /> project where Phase 2 work occurred. This change order eliminates the original lump sum <br /> striping bid item in the contract and adds new striping bid items based on the City's review of <br /> existing conditions and needs. <br /> Exhibit B—Additional Contract Time: <br /> This change order adds 0 (zero)working days to the contract. <br /> Exhibit C—Existing and New Bid Item(s) <br /> See attached for new bid item. <br /> Submittals <br /> N/A <br /> Measurement and Payment <br /> Measurement and Payment per respective item in accordance with Section 8-09 and 8-22. <br /> ATTACHMENTS <br /> • ICI COP 023 Revl. (3 pages) <br /> Page 3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.