My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Constuction Inc 5/4/2020 Change Order 23
>
Contracts
>
Capital Contract
>
Interwest Constuction Inc 5/4/2020 Change Order 23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2020 10:58:23 AM
Creation date
5/27/2020 10:58:13 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Constuction Inc
Approval Date
5/4/2020
Department
Public Works
Department Project Manager
Heather Griffin
Subject / Project Title
Grand Avenue Park Bridge
Public Works WO Number
PW3588
Amendment/Change Order
Change Order
Amendment/Change Order Number
23
Tracking Number
0000801
Total Compensation
$7,758.70
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction Inc. 7/24/2017
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
APPLY-A-LINE, LLC <br /> 175 Roy Rd SW Bldg C Pacific WA 98047 <br /> Tel:253-299-1200 Fax:253-299-1250 <br /> mail@applyaline.com LIC.#APPLYLL834OJ <br /> REVISED <br /> PROPOSAL <br /> ATTENTION: JULIE-INTERWEST CONSTRUCTION <br /> PROJECT: GRAND AVENUE PARK BRIDGE <br /> BID DATE: 3/5/2020 <br /> ITEM DESCRIPTION PLA UNIT TOTAL <br /> QTY BID BID <br /> OFF SITE <br /> 1 PLASTIC FLAT LINE 5,560.00 LF 1.20 $ 6,672.00 <br /> 2 PROFILED PLASTIC LINE 3,360.00 LF 0.80 $ 2,688.00 <br /> 3 PROFILE PLASTIC 8"LINE 200.00 LF 5.50 $ 1,100.00 <br /> 4 PLASTIC ARROWS 8.00 EA 165.00 $ 1,320.00 <br /> 5 PLASTIC CROSSWALK LINE SF $ <br /> 6 RAISED PAVEMENT MARKERS TYPE 2 160.00 EA 4.00 $ 640.00 <br /> 7 REMOVAL PLASTIC CROSSWALK OR ARROWS 60.00 SF 7.50 $ 450.00 <br /> 8 REMOVAL OF RAISED PAVEMENT MARKERS IF NEEDED 333.00 EA 1.80 $ 599.40 <br /> 9 REMOVAL OF EXISTING PAINT OR PLASTIC LINE-IF NEEDED 970.00 LF 1.50 $ 1,455.00 <br /> PARKING LOT <br /> PAVEMENT MARKING 1.00 LS 2375.00 $ 2,375.00 <br /> PAINT LINE <br /> PAINT CROSSWALK <br /> CONCRETE WHEEL STOPS <br /> TOTAL $ 17,299.40 <br /> STIPULATIONS: 1.GENERAL CONTRACTOR TO PROVIDE TRAFFIC CONTROL <br /> 2. GENERAL CONTRACTOR TO PROVIDE PRELIMINARY MARKING FOR STRIPING LAYOUT <br /> 3.THIS PROPOSAL TO BE INCLUDED WITH CONTRACT DOCUMENTS <br /> 4. STANBY TIME$100.00 PER HOUR PER PERSON <br /> BOND NOT INCLUDED <br /> THANK YOU FOR THE OPPORTUNITY TO QUOTE THIS PROJECT WITH <br /> YOUR COMPANY. <br /> SINCERELY, <br /> PRICES INCLUDE MATERIAL, <br /> INSTALLATION&INSURANCE. <br /> PRICES GOOD IF CONTRACT IS <br /> RECEIVED WITHIN 30 DAYS OF <br /> �� AWARD. <br /> MIKE"SUS"SUSNER AFTER 30 DAYS PRICES MUST <br /> ESTIMATOR BE RENEGOTIATED <br />
The URL can be used to link to this page
Your browser does not support the video tag.