Project: Process Water Pump Station <br /> Change Order No. 3 <br /> Change Order Effective Date: March 27, 2020 <br /> CONTRACTOR <br /> By Date: 4 - ZoZ� <br /> Officer <br /> Exhibit A—Description of Changed Work <br /> This Change Order No. 3 adds one (1) new item to the Contract as shown below. <br /> Added Item <br /> New Item# 6—Installation of new Pump Priming System. Add new item#6 entitled, "Installation <br /> of new Pump Priming System" at the agreed to lump sum price of$12,572.00, resulting in a Contract <br /> increase of$12,572.00. <br /> Justification <br /> New Item# 6—Installation of new Pump Priming System. The existing pump priming system is <br /> not a redundant system, which according to the City of Everett Water Filtration Plant Staff, is <br /> necessary for the new Process Water Pump Station to work properly and efficiently. This new item is <br /> being added to account for costs to install a new pump priming system at the Process Water Pump <br /> Station. <br /> Contract Time <br /> There will be 298 calendar days added to the Contract in Change Order No. 3 as shown below. <br /> Following the installation of the new Process Water Pump Station, there were multiple issues with the <br /> running of the system that caused delays to this project, pumps, and pump controls. Below are the <br /> issues that caused delays on this project. <br /> • Purchased and installed new Automatic Duplex Pump Priming System; Thirty (30) days were <br /> previously added in CO # 1,but the system took longer to acquire than originally anticipated, <br /> and after installation, some of the valves needed to be relocated to ensure the system worked <br /> properly. <br /> Page 3 of 4 <br />