My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WA ST Dept of Ecology 4/17/2020
>
Contracts
>
6 Years Then Destroy
>
2022
>
WA ST Dept of Ecology 4/17/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2021 3:04:36 PM
Creation date
5/27/2020 12:40:54 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
WA ST Dept of Ecology
Approval Date
4/17/2020
Council Approval Date
4/8/2020
End Date
1/31/2022
Department
Public Works
Department Project Manager
Erik Emerson
Subject / Project Title
Beverly Lake Water Quality Grant
Tracking Number
0002332
Total Compensation
$247,000.00
Contract Type
Agreement
Contract Subtype
Interlocal
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DEPARTMENT OF <br /> ECOLOGY <br /> State of Washington <br /> Agreement No. WQC-2020-COE-00091 <br /> WATER QUALITY COMBINED FINANCIAL ASSISTANCE AGREEMENT <br /> BETWEEN <br /> THE STATE OF WASHINGTON DEPARTMENT OF ECOLOGY <br /> AND <br /> CITY OF EVERETT <br /> This is a binding Agreement entered into by and between the state of Washington,Department of Ecology,hereinafter <br /> referred to as"ECOLOGY,"and City of Everett,hereinafter referred to as the"RECIPIENT,"to carry out with the <br /> provided funds activities described herein. <br /> GENERAL INFORMATION <br /> Project Title: Beverly Lake Water Quality Retrofit <br /> Total Cost: $988,000.00 <br /> Total Eligible Cost: $988,000.00 <br /> Ecology Share: $741,000.00 <br /> Recipient Share: $247,000.00 <br /> The Effective Date of this Agreement is: 07/01/2019 <br /> The Expiration Date of this Agreement is no later than: 01/31/2022 <br /> Project Type: Stormwater Facility <br /> Project Short Description: <br /> This project will improve water quality in Beverly Lake through installation of GULD-approved stormwater treatment <br /> devices on the City of Everett storm sewer system near discharge points to Beverly Lake.This project will provide <br /> treatment for total suspended solids(TSS). <br /> Project Long Description: <br /> The City of Everett Surface Water Comprehensive Plan(SWCP)identifies untreated stormwater runoff as the primary <br /> water quality issue for Beverly Lake.Beverly Lake is an approximately 12 acre urban lake surrounded by long <br /> established residential areas.The lake has no water quality listings and is not subject to any water body specific <br /> requirements,but is documented to have turbidity/clarity and sedimentation concerns. <br /> This project will provide water quality treatment for the runoff that enters Beverly Lake from approximately 50 acres of <br />
The URL can be used to link to this page
Your browser does not support the video tag.