Laserfiche WebLink
DEPARTMENT OF <br /> ECOLOGY <br /> State of Washington <br /> Agreement No. WQC-2020-COE-00091 <br /> WATER QUALITY COMBINED FINANCIAL ASSISTANCE AGREEMENT <br /> BETWEEN <br /> THE STATE OF WASHINGTON DEPARTMENT OF ECOLOGY <br /> AND <br /> CITY OF EVERETT <br /> This is a binding Agreement entered into by and between the state of Washington,Department of Ecology,hereinafter <br /> referred to as"ECOLOGY,"and City of Everett,hereinafter referred to as the"RECIPIENT,"to carry out with the <br /> provided funds activities described herein. <br /> GENERAL INFORMATION <br /> Project Title: Beverly Lake Water Quality Retrofit <br /> Total Cost: $988,000.00 <br /> Total Eligible Cost: $988,000.00 <br /> Ecology Share: $741,000.00 <br /> Recipient Share: $247,000.00 <br /> The Effective Date of this Agreement is: 07/01/2019 <br /> The Expiration Date of this Agreement is no later than: 01/31/2022 <br /> Project Type: Stormwater Facility <br /> Project Short Description: <br /> This project will improve water quality in Beverly Lake through installation of GULD-approved stormwater treatment <br /> devices on the City of Everett storm sewer system near discharge points to Beverly Lake.This project will provide <br /> treatment for total suspended solids(TSS). <br /> Project Long Description: <br /> The City of Everett Surface Water Comprehensive Plan(SWCP)identifies untreated stormwater runoff as the primary <br /> water quality issue for Beverly Lake.Beverly Lake is an approximately 12 acre urban lake surrounded by long <br /> established residential areas.The lake has no water quality listings and is not subject to any water body specific <br /> requirements,but is documented to have turbidity/clarity and sedimentation concerns. <br /> This project will provide water quality treatment for the runoff that enters Beverly Lake from approximately 50 acres of <br />