My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020/04/29 Council Agenda Packet
>
Council Agenda Packets
>
2020
>
2020/04/29 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2020 10:56:23 AM
Creation date
6/1/2020 10:54:19 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
4/29/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EEVERETT <br /> Change Order No. 2 to the contract with Weber Construction, Inc.for the Diversion Dam Road <br /> Project title: Phase 3 project in the amount of$208,394.12 <br /> City Council Agenda Item Cover Sheet <br /> Council Bill## Consideration: Change Order No.2 <br /> Project: Diversion Dam Road Phase 3 <br /> Agenda dates requested: Partner/Supplier: Weber Construction, Inc. <br /> April 29,2020 Location: Lake Chaplain Water Shed <br /> Briefing Preceding action: Contract Award 7/24/19 <br /> Proposed action - Fund: 401 <br /> Consent <br /> Action <br /> Ordinance Fiscal summary statement: <br /> Public hearing <br /> Yes X No Original Contract Amount: $ 419,958.00 (7/24/2019) <br /> Change Order No. 1 83,945.00(4/6/20) <br /> Budget amendment: <br /> Yes X No Change Order No.2 208,394.12 <br /> PowerPoint presentation: New Contract Total: $ 712,297.12 <br /> Yes X No <br /> Attachments: The source of funds for this contract is Fund 401—Water/Sewer Utility Fund <br /> Change Order No.2 <br /> Department(s)involved: <br /> Puhlir VUnrks, Arimin <br /> Contact person: Project summary statement: <br /> John Nottingham, P.E. <br /> This project addressed drainage, road widening and safety issues.Work included cutting <br /> Phone number: back a cliff face to allow moving the existing road away from the eroding outside cliff <br /> (425)257-8844 edge and adding a drainage ditch along the repaired section.The excess rock was <br /> Email: crushed to provide future road surfacing for roads within the Lake Chaplain Tract.The <br /> jnottingham@everettwa.gov Haybecker Creek Culvert Replacement includes replacing three culvert pipes that are <br /> routinely blocked with one larger culvert. <br /> Initialed by: <br /> Recommendation (exact action requested of Council): <br /> Depament head <br /> Authorize the Mayor to sign this Change Order No. 2 to the contract with Weber <br /> Administration Construction, Inc.for the Diversion Dam Road Phase 3 project in the amount of <br /> $208,394.12. <br /> Council President <br /> 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.