My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020/04/29 Council Agenda Packet
>
Council Agenda Packets
>
2020
>
2020/04/29 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2020 10:56:23 AM
Creation date
6/1/2020 10:54:19 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
4/29/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5 <br /> Exhibit A—Description &Justification of Changed Work <br /> The work within this project encompassed the blasting of rock and forested hillside within the <br /> City's Water Shed in order to relocate a deteriorating gravel roadway; thus, making it safe for <br /> daily travel. Once the work progressed it became obvious that the quantities of rock and <br /> overburden material were going to be much larger than anticipated. The Contractor was <br /> instructed to proceed knowing an adjustment of quantities would be necessary at the close of <br /> the project. This Change Order#2 represents these adjustments as follows. <br /> Bid Description Additional <br /> Item Cost <br /> 4 10,457 additional cubic yards of material were hauled @ the unit price $156,855.00 <br /> of$15.00 per CY. <br /> Total $156,855.00 <br /> • <br /> • Washington State Sales Tax <br /> In addition to the adjustment of quantities this Change Order #2 also includes the addition of <br /> Sale Tax for the entire project. This roadway project was bid without Sale Tax; however, it was <br /> later determined after project award that Sale Tax must be included. The total tax amount is <br /> $51,539.12 (arrived at using the original bid price of $419,958.00 plus Change Order #1 and <br /> ��iarige Order 2 n thefcTat amounfo -$2-4U;8Q0:00-and applying a WSST rate Of 7 /o to-tlie-- -- - <br /> subtotal). <br /> The net increase to the Contract by Change Order #2 then becomes $156,855.00 + <br /> $51,539.12 for a total Contract Price increase of$208,394.12. <br /> 4 CO#2 <br /> 17 <br />