Laserfiche WebLink
CERTIFICATE OF COMPLETION <br /> 2 <br /> Project: 2O19.Biosolids Removal&Disposal <br /> Contractot; Arnerican Processing Group Inc. <br /> Work Order No. UT 3705-2 <br /> • The above mentioned pr--ojectwas constructed per the plans and specifications and-to <br /> the satisfaction of the Public Works-Department <br /> The Contractor physically completed the project, within the time allowed in the <br /> contract. <br /> It is recommended that the City accept this-project as complete. <br /> Recommended by: <br /> - = <br /> -Pu is Works Director Date <br /> Ryan Sass <br /> Approved by: <br /> Mayor,City of Everett Date <br /> Cassie Franklin <br /> Attest: <br /> City Clerk <br /> Sharon Fuller <br /> APPROVED AS TO FORM <br /> By: <br /> City Attorney Date <br /> 5 <br />