Laserfiche WebLink
Purpose Area#4 <br /> F.Construction <br /> Purpose Description of Work Computation <br /> Provide the purpose of the Describe the construction project(s) Compute the costs(e.g.,the nuMber of each item to be purchasedX the cost per item) <br /> construction <br /> Non-Federal Federal <br /> #of Items Cost Total Cost Contribution Request <br /> So So <br /> Total(s) $0 $0 $0 <br /> Narrative <br /> G.Subawards(Subgrants) <br /> Description I Purpose I Consultant? I <br /> 4 <br />