Laserfiche WebLink
Purpose Area#4 <br /> The project manager will need a printer to print reports. A locking file cabinet is needed to keep client information secure.A flatbed scanner is needed to scan various documents collected in <br /> the field. General office supplies will be used bt all personnel on this project and include:pens,pencils,paper,binder clips,and other basic supplies. The office supplies are based on 12 <br /> months at$150 per month. This amount was determined based upon other projects of this size that we have completed in the past. <br /> F.Construction As a rule,construction costs are not allowable.Consult with the program office before budgeting funds in this category. <br /> Purpose Description of Work Computation <br /> Provide the purpose of the Describe the construction Compute the costs(e.g.,the number ofeach item to be purchased X the cost per item) <br /> construction project(s) p <br /> Non-Federal Federal <br /> #of Items Cost Total Cost Contribution Request <br /> $o So <br /> Total(s) $o $o $o <br /> Narrative <br /> G.Subawards(Subgrants) <br /> Description Purpose Consultant <br /> Is the subaward for a <br /> Provide a description of the activities to be carried out by subrecipients. Describe the purpose of the subaward(subgrant) consultant? <br /> T.,+rgi rne+ I Non-Federal I Federal <br /> 5 <br />