Laserfiche WebLink
General Provisions for the Utility <br /> . � Washington State Department of Transportation Accommodation Application <br /> This Permit or Franchise is issued pursuant to the terms of RCW 47.32, RCW 47.44, and WAC 468-34, and <br /> amendments thereto. Renewal of a Franchise must be by application prior to expiration of this Franchise as required by <br /> RCW 47.44.020(3). <br /> 1. A copy of this Permit or Franchise must be on the job site, protected from the elements, at all times during any <br /> construction authorized by this Permit or Franchise. <br /> 2. The Utility agrees to pay the reasonable costs for investigating, handling, and granting the Permit or Franchise, <br /> including, but not limited to basic overhead charges and for providing an inspector during construction and/or <br /> maintenance of the Utility's facilities. Further, the Utility agrees that it shall be responsible for and pay WSDOT's <br /> expended direct and indirect costs associated with applicable provisions of the Permit or Franchise. WSDOT will <br /> assign a reimbursable account to the Utility as a means of invoicing the Utility for the costs associated with this <br /> Permit or Franchise. <br /> (a)WSDOT will assign a reimbursable account to the Utility as a means of invoicing the Utility for the costs associated <br /> with this Permit or Franchise. <br /> (b)WSDOT will invoice the Utility and the Utility agrees to pay WSDOT within thirty (30) calendar days of receipt of an <br /> invoice. <br /> 3. Upon approval of this Permit or Franchise, the Utility shall diligently proceed with the Work and comply with all <br /> General and Special provisions herein. Construction of facilities proposed under this Permit or Franchise shall <br /> begin within one (1)year and must be completed within three (3) years from date of WSDOT approval. "Work" <br /> under this Permit or Franchise shall mean construction, operation, and maintenance of the Utility's facilities as <br /> authorized herein. <br /> 4. The Utility shall notify WSDOT representative in special provision 1 of the name, address, and telephone number <br /> of its contractor when Work outlined herein is going to be performed with other than its own forces. When the Utility <br /> uses a contractor, an authorized representative of the Utility shall be present at all times unless otherwise agreed to <br /> by WSDOT representative.A list of authorized representatives shall be submitted prior to the construction start date. <br /> (Authorized representatives are defined as persons having signatory authority for the Utility and or the authority to <br /> control the Work as needed for any issues identified by WSDOT.) <br /> 5. The Utility agrees to schedule and perform its Work in such a manner as not to delay WSDOT's contractor's work <br /> when WSDOT has a contractor performing work in the vicinity of the Utility's Work. <br /> 6. All contact between WSDOT and the Utility's contractor shall be through the Utility representative. Where the Utility <br /> chooses to perform the Work with its own forces, it may elect to appoint one of its own employees engaged in the <br /> Work as its representative. The Utility, at its own expense, shall adequately police and supervise all Work performed <br /> by itself, its contractor, subcontractor, agent, and/or others, so as not to endanger or injure any person or property. <br /> 7. The Utility shall contact the identified WSDOT representative two (2)weeks prior to conducting Work, to determine <br /> the location of survey control monuments within the area in which the Utility will be working. In the event any <br /> monument or right of way marker will be altered, damaged, or destroyed by the Utility, WSDOT, prior to Utility Work, <br /> will reference or reset the monument or right of way marker. During the Work, upon discovery of a monument <br /> or right of way marker, the Utility shall cease Work in that area and immediately notify WSDOT of the discovery. <br /> WSDOT will coordinate with the Utility to ensure that the monument or right of way marker is recorded or replaced. <br /> The Utility agrees to pay all WSDOT costs to perform monument or right of way marker work, as provided in this <br /> provision, in accordance with general provision 2. <br /> 8. In the event any milepost, fence, or guardrail is located within the limits of the Utility's Work and will be disturbed <br /> during Utility Work, the Utility agrees to carefully remove these highway facilities prior to Utility Work and reset or <br /> replace these highway facilities after the Utility Work, to WSDOT's sole satisfaction and at the sole cost of the Utility. <br /> The Utility agrees that all highway signs and traffic control devices shall not be removed or disturbed during Utility <br /> Work. <br /> DOT Form 224-696 GP <br /> Revised 06/2019 <br />