Laserfiche WebLink
dH/18/2805 15:27 4257478561 GEOTEC}i PAGE 19 <br /> .�s,�o��c�o-i� TEST PIT 5 <br /> Q'b4 �G°� ��°p J`� Description <br /> FILL a•-Tepse�� <br /> Brown.slky SAND�nd pravN,modium-to nne-gralnW,molst,ntedlum-0�noa(FILL) <br /> Nbttled grearJbrown SIIT wkh wnd and gravel,oceaslonal organks,mWium- <br /> plaedc,very moist,soR(FILLj <br /> s FIIL <br /> � <br /> -oW sopsdl <br /> 1 O • Test Pk was terminated at 9 feet on June 20, 2005. <br /> ' Groundvrater seepage was observed at 7 feet during excavation. <br /> ' Severe caving was observed at 3 feet during ezcavatlon. <br /> 15 <br /> � � �.s TEST PIT 6 <br /> �-g �� a <br /> 10 �a�'��1°`'�.°' G`� <br /> 9`� fP �S J`' Descriprion <br /> Teplell <br /> Mottled greeNbrow�,sandy SILT with soma gravel,organics,medium•plastic,very <br /> mofsR soft(FIIL) <br /> 5 �u <br /> ,�O OFI B�aw�organle SILT <br /> • Test Pit was terminated at 10 feet on June 20,2005. <br /> • No groundwater seepage was observed during excavation. <br /> • No caving was observed during excavation. <br /> 15 <br /> � TEST PIT LOG <br /> ` GEOTECH 11804 Highway 99 <br /> coNsvr,T,+.Nrs,nvc Everett, Washington <br /> Job Wte: by: P/aee: <br /> 05233 June2005 ZJM 5 <br />