My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11611 AIRPORT RD Geotech Report 2018-01-02 MF Import
>
Address Records
>
AIRPORT RD
>
11611
>
Geotech Report
>
11611 AIRPORT RD Geotech Report 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2022 1:26:17 PM
Creation date
6/1/2020 1:46:38 PM
Metadata
Fields
Template:
Address Document
Street Name
AIRPORT RD
Street Number
11611
Address Document Type
Geotech Report
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
( � <br /> Cornerstone 17625-130'^Ave. NE,C-102 Woodinville,WA 98072 <br /> Phone: 425-844•1977 <br /> � Geotechnical� InCi. Fax: 425-84t-1987 <br /> May i l, 2001 <br /> Mr. Hyong Nam Ahn <br /> 1002 Washington Avenue <br /> Mukil[eo,Washington 98275 <br /> Geotechnical Engineering RepoR <br /> Proposed Ahn Warehouse <br /> Snohomish County,Washington <br /> CG File No. 1121 <br /> Dear Mr. Ahn: <br /> INTRODUCTION <br /> This report presents the results of our geotechnical engineering investigation for your planned <br /> warehouse facility located near Paine Field in Snohomish County, Washington. The site is <br /> located at 11533 Airport Road, as shown on the Vicinity Map in Fig�re L For our use in <br /> preparing this repoR,we have been provided with a faxed drawing by Gery Parkinson Architects. <br /> The site consists of a rectangular-shaped lot located on the east side of Airport Road. The ground <br /> surface slopes downward awa;� from the roadway, and sl�pes down steeply to a wetland at the <br /> east end of the site. The slope is composed of nonstructural fill; and to minimize oz�erexcavation <br /> costs, a daylight construction is planned. The planned structure will be located within the cenhal <br /> portion of ihe lot and it is planned to be a one-story warehouse with a daylight basement. Paved <br /> parking will be located on the upslope (westem) and downslope (eastem) sides of the building. <br /> We have not been provided with a grading plan for the site,but we expect a significant amout�:of <br /> 2rading will be required to provide the lower level parking. We understand that the grading plan <br /> may include the use of rockeries and concrete retaining walls. The location and height of the <br /> rockeries and/or walls has not been provided to us at the issue of th�s report. <br /> -a� <br /> � <br />
The URL can be used to link to this page
Your browser does not support the video tag.