Laserfiche WebLink
� <br /> r . � , �. <br /> . � <br /> � Geotechnical Engineering Evaluation <br /> Everett Vcterinary Clinic <br /> February 21, 2002 <br /> NGA File No. 342902 <br /> r Page 5 <br /> r Seismic Potential <br /> 1 The project site is located within Zone 3 of the Seismic Zone Map shown as Figure 16-2 of the 1997 <br /> Uniform Building Code(UBC). This correspoRds to a Seismic Zone Factor,Z, of 0.30. We recommend <br /> I thet the subsurface soils be considered Soil Profile Type S�,as described in the UBC. <br /> ( Harards assceiated with seismic activity include liquefaction potential and amplification of ground <br /> motion. Liquefaction is caus�;d by a rise in pore pressures in a loose sand deposit beneath the ground <br /> � i� <br /> water table. The medium dense to dense, glacial till soils that are interpreted to underlie the site have a <br /> low potential for liquefaction or amplification of ground motion. � <br /> I CONCLUSIONS AND RECOMMENDATIONS <br /> I General <br /> It is our opinion that the site is compatible. f:om a geotechnical standpoint, with the planned <br /> development. The underlying medium dense to dense native glacial soils should provide ade��uate <br /> I- support for the planned stnicwre. Foundntions for ttx: st�vcture should exlend through any topsoil or <br /> loose soils and bear on the underlying medium dense to deuse r lacial till soils or structural fill suppo�ted <br /> I-- on these soils. Medium dense native soils were encountered ro:cghly between 1 and 3 feet below tF� <br /> existing surface elevation at the Icxations of our explorations. <br /> ' Shallow perched ground water was encounte��ed in the majority of our stibsurFace explorations. We <br /> Iexpect the amount of this perched water to decrease during the dry season. Ho:vever, project budget and <br /> scheduling should nllow for additional effcsrts to control ground water if encoun:erod in structure or utility <br /> Iexcavations. We huve provided preliminary recommendations for ground wate� :-�ntrol in the Site <br /> Drainage subsection of this report. <br /> We understand that a detention ponG is planned at the east side of the site. The design for ihis vond has <br /> not been completed. We recommend that grading in the pond area and fill placement and compection be <br /> performed in accordance with the recommendations found in the Site Preparation and Gradiog a�d <br /> � Structural FIII subsections of this report. Silty, low-permeability fill liner should be used inside the pond <br /> � or a synthetic liner could be ��ed. We recommend that the interior sides of the pond have an inclination <br /> I no sreeper than 3H:1V. We should be retained to review detention pond design and provide specific <br />' I recommendntions for pond liner and pond installation. <br /> I NELSON GEOTECHNICAL ASSOC/ATES, INC � <br />� ,1 <br />