My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2910 SEAWAY BLVD 2020-06-03
>
Address Records
>
SEAWAY BLVD
>
2910
>
2910 SEAWAY BLVD 2020-06-03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/3/2020 9:54:08 AM
Creation date
6/3/2020 9:53:28 AM
Metadata
Fields
Template:
Address Document
Street Name
SEAWAY BLVD
Street Number
2910
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• PUBLIAVORKS PERMIT Date Applied: 1/8/2019 <br /> City of Everett Permit Services Public Works Permit#: PW1901-015 <br /> f4P <br /> 3200 Cedar Street, 2nd Floor Associated Bldg Permit#: <br /> Everett,WA 98201 Planning Reference#: <br /> (425)257-8810 Public Works Fee: $65.00 <br /> ,.., :.'.. 24 JAN 2019 <br /> OWNER NAME AND ADDRE1L <br /> ' f.1it, J � • PPLICANT NAME AND ADDRESS: <br /> BOEING COMPANY APPROVAL :OEING COMPANY <br /> POBOX 3707 MS 6A1-01 'O BOX 3707 MC OH-13 <br /> SEATTLE, WA, 98124 1 z 2020 .EATTLE, WA, 98124 <br /> PHONE: HONE: 4258762594 <br /> ARCH I VFX <br /> TAX PARCEL ID#: 28040300 . .. ITE ADDRESS: 2910 SEAWAY <br /> DESCRIPTION: SERVICE ROAD TREES TO BE REMOVED <br /> SERVICE RD FROM THE 40-41 BLDG TO THE 40-201 ACTIVITY CENTER BUILDING <br /> THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br /> PERMIT CONDITIONS: <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett`Design and Construction Standards <br /> and Specifications for Development'. <br /> 3. Call Location Underground Service 48 hours before you dig. The day you call does not count. TOLL FREE NUMBER 811. <br /> 4. Site work to be done per plans approved by the City of Everett Planning and Public Works Departments. Approved plans <br /> must remain on job-site at all times. <br /> 5. Inspections are required for all stages of construction. Visit the City's Online Permitting Portal at pw.everettwa.gov to <br /> formally request all required inspections. Flyers are provided at permit issuance with instructions on how to request an <br /> inspection online. <br /> 6. Keep City streets clean at all times. No dirt, mud, rocks, or debris to be tracked onto roadway. Install erosion control <br /> measures as need and remove prior to permit final. <br /> 7. Protect all existing underground utilities during construction. <br /> 8. A Landscape Inspection is required by the Planning Department prior to final by the Public Works Inspector. Schedule the <br /> existing Planning Landscape inspection under"My Active Inspections" in your dashboard on the Online Permitting Portal. <br /> 9. This permit must be finaled in order to close out this permit. Request a final inspection online by selecting PW 22-Site <br /> Final within the Online Permitting Portal Inspection Requests for this permit when all items have been completed. . <br /> Public Works Permit Fee Breakdown: so <br /> Misc. Minor Permits (Tree Removal) $25.00 fi az az <br /> PW Plan Review $20.00 <br /> PW Site Inspection $20.00 li JAN 2 4 2019 <br /> CITY OF EVERETT <br /> Permit Services <br /> City of Everett Official Use Only ACKNOWLEDGEMENT OF CONDITIONS <br /> / The undersigned owner/applicant hereby agrees to hold and save <br /> harmless the City of Everett from any and all claims for damages,costs, <br /> �,, /6,f-41 <br /> /a3 / expenses,or causes of action that may arise because of installation and <br /> /It t (((///IIINNN / maintenance of the improvement or other right-of-way use here to applied <br /> Approved for Construction (Public Works) Date for and further agrees to remove same upon notice from the City and to <br /> replace public property damaged thereby. <br /> FINAL INSPECTION Date <br /> tlz`�/19 <br /> Approved as Constructed (PW Inspector) ignature of Applicant Date <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY PURSUED TO <br /> COMPLETEION.THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90-DAY DURATION. <br />
The URL can be used to link to this page
Your browser does not support the video tag.