My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction 5/14/2020
>
Contracts
>
Capital Contract
>
Granite Construction 5/14/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/3/2020 10:31:17 AM
Creation date
6/3/2020 10:25:00 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction
Approval Date
5/14/2020
Council Approval Date
4/8/2020
Department
Public Works
Department Project Manager
Gael Fisk
Subject / Project Title
2020 Pavement Maintenance Overlay
Public Works WO Number
PW3727
Tracking Number
0002335
Total Compensation
$3,560,249.50
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
304
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
; . <br /> BID PROPOSAL <br /> BASE BID <br /> SCHEDULE B -MITIGATION TRAIL <br /> ITEM PLAN AMOUNT TOTAL AMOUNT <br /> NO. QUANITITY ITEM DESCRIPTION (FIGURES) (FIGURES) <br /> I1. 1 Mobilization $ )'3 ow . % $ rj • �—' <br /> Lump Sum Per L.S. <br /> 2. 100 Fiaggers(Minimum Bid $ 61�j . $ 9 bop <br /> Hour Prevailing Wage) Per Hour 1 <br /> I 00,-- <br /> � <br /> 3. 1 Project Temporary Traffic $ t,'2,1(' $ UJ40 • <br /> Lump Sum Control Per L.S. <br /> I <br /> 4. 3,297 HMA Class 3/8 Inch,PG 64- 6` . V- $ • t9S' <br /> Ton 22 Per Ton <br /> I <br /> 5. 1,293 HMA Class 1/2 Inch,PG 64- $ . I $ (,s I'1' '4 • <br /> Ton 22 Per Ton <br /> n �p 60 <br /> 6. 55 Sawcut Asphalt Concrete $ L-- • $ 1 t 0 . ---- <br /> ILinear Foot Pavement Per L.F. <br /> 7. 106 Portable Changeabte $ "�j . $ � � `� <br /> IHour Message Sign Per Hour <br /> 8. 1 Resolve Above Ground $ 500 .00 $ 500 . 00 <br /> IEstimate Conflicts Per Est. <br /> 9. 1 Erosion/Water Pollution $ 500 .00 $ 500 . 00 <br /> IEstimate Control Per Est. �^ <br /> BASE BID <br /> I SCHEDULE B $`i 2---1 (60 • <br /> sonor <br /> SUBTOTAL <br /> I <br /> I <br /> 2020 PAVEMENT MAINTENANCE OVERLAY SCHEDULE B DIVISION P <br /> I <br /> WORK ORDER 3727 FEBRUARY 20, 2020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.