My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction 5/14/2020
>
Contracts
>
Capital Contract
>
Granite Construction 5/14/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/3/2020 10:31:17 AM
Creation date
6/3/2020 10:25:00 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction
Approval Date
5/14/2020
Council Approval Date
4/8/2020
Department
Public Works
Department Project Manager
Gael Fisk
Subject / Project Title
2020 Pavement Maintenance Overlay
Public Works WO Number
PW3727
Tracking Number
0002335
Total Compensation
$3,560,249.50
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
304
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> BID PROPOSAL I <br /> BID ADDITIVE <br /> SCHEDULE E-PACIFIC AVE <br /> ITEM PLAN AMOUNT TOTAL AMOUNT <br /> NO. QUANITITY ITEM DESCRIPTION (FIGURES) (FIGURES) <br /> ere <br /> C <br /> 1. 1 Mobilization $ 6 M.) . __ $ J I 000 . c'e) <br /> Lump Sum Per L.S. <br /> I <br /> 2. 165 Flaggers(Minimum Bid $ 9 �. $ t5 1445 <br /> . BO <br /> Hour Prevailing Wage) Per Hour <br /> 3. 1 Project Temporary Traffic $ 2-t 2-0 - _$ 2 (Z(. • `-- I <br /> Lump Sum Control Per L.S. <br /> 4. 428 HMA Class 1/2 Inch,PG 64-22 $ $ > t co(DO . <br /> 60 <br /> Ton Per Ton <br /> 5. 1 Adjust Manhole to Grade $ I W . — $ 100 I <br /> Each Per Each <br /> 6. 1 Adjust Catch Basin/Inlet to $ 100. $ I 00 • — I <br /> Each Grade Per Each <br /> 7. 2 Adjust Valve Box to Grade $ 1 00 . % $ 2cx) . `� I <br /> Each Per Each <br /> CO <br /> 8. 1 Adjust Existing Monument $ ( (i() . ce i- $ I 00 . 1 <br /> Each Castings to Grade Per Each <br /> 9. 3,193 Planing Bituminous $ 9) . $ Raj 9 . I <br /> Square Yard Pavement(2"Deep) Per S.Y. i <br /> 10. 958 Additional Planing $ 0 . 75 $ 2.3 . ---- <br /> I <br /> Square Yard Bituminous Pavement Per S.Y. <br /> 11. 550 Vehicle Loop Detectors $ ( '3 . ej. $ 52,S 0 . <br /> Linear Foot Per L.F. <br /> 12. I <br /> 13. I <br /> 2020 PAVEMENT MAINTENANCE OVERLAY SCHEDULE_r E DIVISION P I <br /> n <br /> WORK ORDER 3727 �Or lr dati?// MARCH 16,2020 <br /> Provided to Builders Exchange of WA,Inc.For usage Conditions Agreement see www.bxwa.com-Always Verify Scale I <br />
The URL can be used to link to this page
Your browser does not support the video tag.