Laserfiche WebLink
• <br /> CITY OF EVERETT, WASHINGTON <br /> CONTRACT <br /> THIS CONTRACT is made and entered into this % day of APC2%1_ , 2020, by and <br /> between the City of Everett, Washington, a municipal corporation existing under the laws of the <br /> State of Washington, hereinafter called the "City," and <br /> RAri c l.'vh aS12. G-'t'iac.z Cot t�►a`-I <br /> a Cr.�L.trol2t,a" Co -CatzStoak4t41.3 , hereinafter called the"Contractor." <br /> In consideration of the sums to be paid to it by the City, Contractor hereby covenants and <br /> agrees to furnish all labor, tools, materials, equipment, and supplies required to build and <br /> construct and to build and construct in a workmanlike manner the work, improvements, and <br /> appurtenances in accordance with the Specifications and Plans entitled: "2020 Pavement <br /> Maintenance Overlay" (the "Project"). <br /> 1. Contract Documents. The following documents ("Contract Documents") are incorporated <br /> by reference and are hereby made a part of this Contract: <br /> A. Notice to Contractors <br /> B. Instructions to Bidders (if any) <br /> C. Washington State Department of Transportation Standard Specifications 2018 as <br /> modified by all amendments thereto as of the date of bid opening of this Project <br /> ("Standard Specifications"). <br /> D. Special Provisions <br /> E. Plans, Drawings and Project Specifications <br /> F. Addenda (if any) <br /> G. Performance Bond and Payment Bond <br /> H. Contractor's Proposal/Bid (conformed copy dated 3 - -4 .43.).A4 <br /> I. All provisions required by law whether set forth and reproduced herein or not <br /> 2. Time for Completion. Substantial completion shall be achieved within fifty-eight (58) <br /> working days of the effective date of the Notice to Proceed. Physical completion shall be within <br /> ten (10)working days of the actual date of issuance of substantial completion. <br /> 3. Liquidated Damages. The parties agree the City will suffer damage and be put to additional <br /> expense in the event that the Contractor does not complete the work in all respects and have it <br /> ready for use by the substantial completion date stated. Because it is difficult to accurately <br /> compute the amount of such costs and damages, the Contractor hereby covenants and agrees <br /> to pay to the City liquidated damages as computed in Section 1-08.9 of the Standard <br /> Specifications, for each and every working day required to accomplish substantial completion of <br /> the work in excess of the period established above for substantial completion. For overruns in <br /> contract time occurring after the physical completion date, liquidated damages shall be <br /> assessed at the rate of ten percent (10%) of the amount computed in Section 1-08.9 of the <br /> Standard Specifications until the work is physically complete. <br /> 2020 PAVEMENT MAINTENANCE OVERLAY PAGE 1 OF 6 CONTRACr <br /> WORK ORDER 3727 February 20,2020 <br />