My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction 5/14/2020
>
Contracts
>
Capital Contract
>
Granite Construction 5/14/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/3/2020 10:31:17 AM
Creation date
6/3/2020 10:25:00 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction
Approval Date
5/14/2020
Council Approval Date
4/8/2020
Department
Public Works
Department Project Manager
Gael Fisk
Subject / Project Title
2020 Pavement Maintenance Overlay
Public Works WO Number
PW3727
Tracking Number
0002335
Total Compensation
$3,560,249.50
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
304
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> Benefit Code Key—Effective 3/4/2020 thru 9/1/2020 <br /> Note Codes Continued <br /> 9. A. Workers working with supplied air on hazmat projects receive an additional$1.00 per hour. <br /> Special Shift Premium: Basic hourly rate plus $2.00 per hour. When due to conditions beyond the control of the <br /> Employer or when an owner(not acting as the contractor),a government agency or the contract specifications require <br /> that more than four(4)hours of a special shift can only be performed outside the normal 6 am to 6pm shift,then the <br /> special shift premium will be applied to the basic straight time for the entire shift. When an employee works on a <br /> special shift,they shall be paid a special shift premium for each hour worked unless they are in overtime or double- <br /> time status.(For example,the special shift premium does not waive the overtime requirements for work performed on <br /> Saturday or Sunday.) <br /> Certified Crane Operator Premium: Crane operators requiring certifications shall be paid$0.50 per hour above their <br /> classification rate. <br /> Boom Pay Premium: All cranes including tower shall be paid as follows based on boom length: <br /> (A)—130'to 199'—$0.50 per hour over their classification rate. <br /> (B)—200'to 299'—$0.80 per hour over their classification rate. <br /> (C)—300'and over—$1.00 per hour over their classification rate. <br /> B. The highest pressure registered on the gauge for an accumulated time of more than fifteen(15)minutes during the <br /> shift shall be used in determining the scale paid. <br /> Tide Work:When employees are called out between the hours of 6:00 p.m.and 6:00 a.m.to work on tide work(work <br /> located in the tide plane) all time worked shall be at one and one-half times the hourly rate of pay. Swinging <br /> Stage/Boatswains Chair:Employees working on a swinging stage or boatswains chair or under conditions that require <br /> them to be tied off to allow their hands to be free shall receive seventy-five cents ($0.75) per hour above the <br /> classification rate. <br /> C. Tide Work:When employees are called out between the hours of 6:00 p.m.and 6:00 a.m.to work on tide work(work <br /> located in the tide plane) all time worked shall be at one and one-half times the hourly rate of pay. Swinging <br /> Stage/Boatswains Chair:Employees working on a swinging stage or boatswains chair or under conditions that require <br /> them to be tied off to allow their hands to be fin shall receive seventy-five cents ($0.75) per hour above the <br /> classification rate. I <br /> Effective August 31,2012—A Traffic Control Supervisor shall be present on the project whenever flagging or spotting <br /> or other traffic control labor is being utilized.A Traffic Control Laborer performs the setup,maintenance and removal <br /> of all temporary traffic control devices and construction signs necessary to control vehicular,bicycle,and pedestrian <br /> traffic during construction operations.Flaggers and Spotters shall be posted where shown on approved Traffic Control <br /> Plans or where directed by the Engineer.All flaggers and spotters shall possess a current flagging card issued by the <br /> State of Washington,Oregon,Montana,or Idaho.These classifications are only effective on or after August 31,2012. <br /> D. Industrial Painter wages are required for painting within industrial facilities such as treatment plants,pipelines, <br /> towers,dams,bridges,power generation facilities and manufacturing facilities such as chemical plants,etc.,or <br /> anywhere abrasive blasting is necessary to prepare surfaces,or hazardous materials encapsulation is required. <br /> E. Heavy Construction includes construction,repair,alteration or additions to the production,fabrication or <br /> manufacturing portions of industrial or manufacturing plants,hydroelectric or nuclear power plants and atomic <br /> reactor construction.Workers on hazmat projects receive additional hourly premiums as follows-Level A:$1.00, <br /> Level B:$0.75,Level C:$0.50,And Level D:$0.25. <br /> 1 <br /> 14 ' <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.