My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction 5/14/2020
>
Contracts
>
Capital Contract
>
Granite Construction 5/14/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/3/2020 10:31:17 AM
Creation date
6/3/2020 10:25:00 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction
Approval Date
5/14/2020
Council Approval Date
4/8/2020
Department
Public Works
Department Project Manager
Gael Fisk
Subject / Project Title
2020 Pavement Maintenance Overlay
Public Works WO Number
PW3727
Tracking Number
0002335
Total Compensation
$3,560,249.50
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
304
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ITEM DESCRIPTION YES NO <br /> 53. Fencing materials x <br /> 54. Guide Posts x <br /> 55. Traffic Buttons X ' <br /> 56. Epoxy <br /> 57. Cribbing x <br /> 58. Water distribution materials <br /> 59. Steel "H" piles , <br /> X <br /> 60. Steel pipe for concrete pile casings x ' <br /> 61. Steel pile tips, standard <br /> 62. Steel pile tips, custom X <br /> Prefabricated items specifically produced for public works projects that are prefabricated in a <br /> county other than the county wherein the public works project is to be completed, the wage for <br /> the offsite prefabrication shall be the applicable prevailing wage for the county in which the actual <br /> prefabrication takes place. <br /> It is the manufacturer of the prefabricated product to verify that the correct county wage rates are <br /> applied to work they perform. <br /> See RCW 39.12.010 <br /> (The definition oflocality"in RCW 39.12.010(2)contains the phrase"wherein the physical work is being performed."The department <br /> interprets this phrase to mean the actual work site. <br /> 1 <br /> Supplemental to Wage Rates 8 <br /> 03/04/2020 Edition, Published February 7, 2020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.