My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction 5/14/2020
>
Contracts
>
Capital Contract
>
Granite Construction 5/14/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/3/2020 10:31:17 AM
Creation date
6/3/2020 10:25:00 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction
Approval Date
5/14/2020
Council Approval Date
4/8/2020
Department
Public Works
Department Project Manager
Gael Fisk
Subject / Project Title
2020 Pavement Maintenance Overlay
Public Works WO Number
PW3727
Tracking Number
0002335
Total Compensation
$3,560,249.50
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
304
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> I <br /> (3) All travel time that relates to the work covered under subsection (2) of this section <br /> I requires the payment of prevailing wages. Travel time includes time spent waiting to load, <br /> loading, transporting, waiting to unload, and delivering materials. Travel time would <br /> include all time spent in travel in support of a public works project whether the vehicle is <br /> I empty or full. For example, travel time spent returning to a supply source to obtain another <br /> load of material for use on a public works site or returning to the public works site to obtain <br /> another load of excavated material is time spent in travel that is subject to prevailing wage. <br /> I Travel to a supply source, including travel from a public works site, to obtain materials for <br /> use on a private project would not be travel subject to the prevailing wage. <br /> (4) Workers are not subject to the provisions of chapter 39.12 RCW when they deliver <br /> Imaterials to a stockpile. <br /> (a) A "stockpile" is defined as materials delivered to a pile located away from the site <br /> I of incorporation such that the stockpiled materials must be physically moved from the <br /> stockpile and transported to another location on the project site in order to be incorporated <br /> into the project. <br /> I (b) A stockpile does not include any of the functions described in subsection (2)(a) <br /> through (f) of this section; nor does a stockpile include materials delivered or distributed <br /> multiple locations upon the project site; nor does a stockpile include materials dumped <br /> Ito <br /> at the place of incorporation, or adjacent to the location and coordinated with the <br /> incorporation. <br /> I (5)The applicable prevailing wage rate shall be determined by the locality in which the <br /> work is performed. Workers subject to subsection (2)(d) of this section,who produce such <br /> materials at an off-site facility shall be paid the applicable prevailing wage rates for the <br /> I county in which the off-site facility is located. Workers subject to subsection (2) of this <br /> section, who deliver such materials to a public works project site shall be paid the <br /> applicable prevailing wage rates for the county in which the public works project is located. <br /> I <br /> [Statutory Authority: Chapter 39.12 RCW, RCW 43.22.051 and 43.22.270. 08-24-101, § <br /> I 296-127-018,filed 12/2/08,effective 1/2/09.Statutory Authority: Chapters 39.04 and 39.12 <br /> RCW and RCW 43.22.270. 92-01-104 and 92-08-101, § 296-127-018, filed 12/18/91 and <br /> 4/1/92, effective 8/31/92.] <br /> I <br /> I <br /> I <br /> I <br /> IISupplemental to Wage Rates 11 <br /> 03/04/2020 Edition, Published February 7, 2020 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.