Laserfiche WebLink
I <br /> 1 DIVISION 5 <br /> 2 SURFACE TREATMENTS AND PAVEMENTS I <br /> 3 5-04 Hot Mix Asphalt 42 <br /> 4 5-04.1 Description 42 I <br /> 5 5-04.2 Materials 42 <br /> 6 5-04.2(1) How to Get a HMA Mix Design on the QPL 43 I <br /> 7 5-04.2(2) Mix Design -Obtaining Project Approval 43 <br /> 8 5-04.2(2)A Vacant -44 I <br /> 9 5-04.2(2)B Using Warm Mix Asphalt Processes 44 <br /> 10 5-04.3 Construction Requirements 44 I <br /> 11 5-04.3(1) Weather Limitations 44 <br /> 12 5-04.3(2) Paving Under Traffic 45 I <br /> 13 5-04.3(3) Equipment 45 <br /> 14 5-04.3(3)A Mixing Plant 45 <br /> 15 5-04.3(3)B Hauling Equipment 46 , <br /> 16 5-04.3(3)C Pavers 47 <br /> 17 5-04.3(3)D Material Transfer Device or Material Transfer Vehicle 47 I <br /> 18 5-04.3(3)E Rollers 48 <br /> 19 5-04.3(4) Preparation of Existing Paved Surfaces 48 I <br /> 20 5-04.3(4)A Crack Sealing 49 <br /> 21 5-04.3(4)A1 General 49 <br /> 22 5-04.3(4)A2 Crack Sealing Areas Prior to Paving 50 <br /> 23 5-04.3(4)A3 Crack Sealing Crack Sealing Areas Not to be Paved 50 <br /> 24 5-04.3(4)B Vacant 50 <br /> 25 5-04.3(4)C Pavement Repair 50 <br /> 26 5-04.3(5) Producing/Stockpiling Aggregates and RAP 51 <br /> 27 5-04.3(6) Mixing 51 I <br /> 28 5-04.3(7) Spreading and Finishing 52 <br /> 29 5-04.3(8)Aggregate Acceptance Prior to Incorporation in HMA 52 <br /> 30 5-04.3(8)A General 52 1 <br /> 31 5-04.3(9) HMA Mixture Acceptance 53 <br /> 32 5-04.3(9)A Vacant 54 I <br /> 33 5-04.3(9)B Vacant 54 <br /> 34 5-04.3(9)C Mixture Acceptance- Nonstatistical Evaluation 54 I <br /> 35 5-04.3(9)C1 Mixture Nonstatistical Evaluation- Lots and Sublots 54 <br /> 36 5-04.3(9)C2 Mixture Nonstatistical Evaluation Sampling 54 I <br /> 37 5-04.3(9)C3 Mixture Nonstatistical Evaluation -Acceptance Testing 55 <br /> 2020 PAVEMENT MAINTENANCE OVERLAY PAGE D OF 7 SPECIAL PROVISIONS I <br /> WORK ORDER 3727 FEBRUARY 17,2020 <br />