My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction 5/14/2020
>
Contracts
>
Capital Contract
>
Granite Construction 5/14/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/3/2020 10:31:17 AM
Creation date
6/3/2020 10:25:00 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction
Approval Date
5/14/2020
Council Approval Date
4/8/2020
Department
Public Works
Department Project Manager
Gael Fisk
Subject / Project Title
2020 Pavement Maintenance Overlay
Public Works WO Number
PW3727
Tracking Number
0002335
Total Compensation
$3,560,249.50
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
304
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 5-04.4 Measurement 64 I <br /> 2 5-04.4 Payment 65 <br /> 3 <br /> 4 DIVISION 7 I <br /> 5 DRAINAGE STRUCTURES, STORM SEWERS, SANITARY <br /> 6 SEWERS, WATER MAINS,AND CONDUITS I <br /> 7 7-05 MANHOLES, INLETS, CATCH BASINS,AND DRYWELLS 66 <br /> 8 7-05.3 Construction Requirements 66 I <br /> 9 7-05.3(1)Adjusting Manholes and Catch Basins to Grade 66 <br /> 10 7-05.3(5)Adjusting Valve Boxes to Grade 67 I <br /> 11 7-05.4 Measurement 67 <br /> 12 7-05.5 Payment 67 I <br /> 13 <br /> 14 DIVISION 8 <br /> 15 MISCELLANEOUS CONSTRUCTION <br /> 16 8-09 RAISED PAVEMENT MARKERS 69 <br /> 17 8-09.1 Description 69 I <br /> 18 8-09.2 Materials 69 <br /> 19 8-09.3 Construction Requirements 69 1 <br /> 20 8-09.3(5)Asphalt Adhesives 69 <br /> 21 8-09.4 Measurement 70 I <br /> 22 8-09.5 Payment 70 <br /> 23 8-13 MONUMENT CASES 70 I <br /> 24 8-13.1 Description 70 <br /> 25 8-13.2 Vacant 70 I <br /> 26 8-13.3 Construction Requirements 70 <br /> 27 8-13.4 Measurement 70 I <br /> 28 8-13.5 Payment 70 <br /> 29 8-20 ILLUMINATION, TRAFFIC SIGNAL SYSTEMS, INTELLIGENT <br /> 30 TRANSPORTATION SYSTEMS,AND ELECTRICAL 71 I <br /> 31 8-20.2 Materials - Fiber Optic Cable, Electrical Conductors, and Cable 71 <br /> 32 8-20.3 Construction Requirements 72 I <br /> 33 8-20.3(6) Junction Boxes, Cable Vaults, and Pull Boxes 72 <br /> 34 8-20.3(14) Signal Systems 72 I <br /> 35 8-20.3(14)C Induction Loop Vehicle Detectors 72 <br /> 36 8-20.4 Measurement 74 • <br /> I <br /> 37 8-20.5 Payment 74 <br /> 2020 PAVEMENT MAINTENANCE OVERLAY PAGE F OF 7 SPECIAL PROVISIONS <br /> WORK ORDER 3727 FEBRUARY 17,2020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.