My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction 5/14/2020
>
Contracts
>
Capital Contract
>
Granite Construction 5/14/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/3/2020 10:31:17 AM
Creation date
6/3/2020 10:25:00 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction
Approval Date
5/14/2020
Council Approval Date
4/8/2020
Department
Public Works
Department Project Manager
Gael Fisk
Subject / Project Title
2020 Pavement Maintenance Overlay
Public Works WO Number
PW3727
Tracking Number
0002335
Total Compensation
$3,560,249.50
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
304
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 SNOHOMISH COUNTY PUD #1 <br /> 2 ATTENTION: ANDRA SHAUGHNESSY FLAHERTY <br /> 3 DESK PHONE: (425) 783-4419 <br /> 4 CELL PHONE: (425) 345-0312 <br /> 5 EMAIL: ALFLAHERTY@SNOPUD.COM I <br /> 6 ADDRESS: P.O. BOX 1107 <br /> 7 EVERETT, WA 98206 <br /> 8 <br /> 9 WAVE COMMUNICATION <br /> 10 ATTENTION: JIM BIGGS <br /> 11 DESK PHONE: (206) 786-8720 I <br /> 12 CELL PHONE: <br /> 13 EMAIL: JBIGGSCa�WAVEBROADBAND.COM <br /> 14 WA-CONSTRUCTION@WAVEBROADBAND.COM <br /> 15 ADDRESS: 4766 1 ST AVE S <br /> 16 SEATTLE, WA 98134 <br /> 17 *** <br /> 18 I 19 COE 1-07.18.RTF <br /> 20 1-07.18 Public Liability and Property Damage Insurance <br /> 21 I 22 Delete this section in its entirety, and replace it with the following: <br /> 23 <br /> 24 1-07.18 Insurance <br /> II <br /> 25 (January 4, 2016 APWA GSP) <br /> 26 <br /> 27 1-07.18(1) General Requirements <br /> 28 A. The Contractor shall procure and maintain the insurance described in all subsections of <br /> 29 section 1-07.18 of these Special Provisions, from insurers with a current A. M. Best rating of <br /> 30 not less than A-: VII and licensed to do business in the State of Washington. The <br /> 31 Contracting Agency reserves the right to approve or reject the insurance provided, based on <br /> 32 the insurer's financial condition. <br /> 33 <br /> 34 B. The Contractor shall keep this insurance in force without interruption from the <br /> 35 commencement of the Contractor's Work through the term of the Contract and for thirty (30) <br /> 36 days after the Physical Completion date, unless otherwise indicated below. <br /> 37 <br /> 38 C. If any insurance policy is written on a claims made form, its retroactive date, and that of all <br /> 39 subsequent renewals, shall be no later than the effective date of this Contract. The policy <br /> 40 shall state that coverage is claims made, and state the retroactive date. Claims-made form <br /> 41 coverage shall be maintained by the Contractor for a minimum of 36 months following the <br /> 42 Completion Date or earlier termination of this Contract, and the Contractor shall annually <br /> 43 provide the Contracting Agency with proof of renewal. If renewal of the claims made form of I <br /> 44 coverage becomes unavailable, or economically prohibitive, the Contractor shall purchase <br /> 45 an extended reporting period ("tail") or execute another form of guarantee acceptable to the <br /> 46 Contracting Agency to assure financial responsibility for liability for services performed. I <br /> 47 <br /> 48 D. The Contractor's Automobile Liability, Commercial General Liability and Excess or Umbrella <br /> 49 Liability insurance policies shall be primary and non-contributory insurance as respects the <br /> 50 Contracting Agency's insurance, self-insurance, or self-insured pool coverage.Any insurance, <br /> 51 self-insurance, or self-insured pool coverage maintained by the Contracting Agency shall be <br /> 52 excess of the Contractor's insurance and shall not contribute with it. <br /> 53 I <br /> 2020 PAVEMENT MAINTENANCE OVERLAY PAGE 20 OF 79 SPECIAL PROVISIONS I <br /> WORK ORDER 3727 FEBRUARY 20,2020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.