Granite Construction 5/14/2020
>
Contracts
>
Capital Contract
>
Granite Construction 5/14/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/3/2020 10:31:17 AM
Creation date
6/3/2020 10:25:00 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction
Approval Date
5/14/2020
Council Approval Date
4/8/2020
Department
Public Works
Department Project Manager
Gael Fisk
Subject / Project Title
2020 Pavement Maintenance Overlay
Public Works WO Number
PW3727
Tracking Number
0002335
Total Compensation
$3,560,249.50
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
304
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 When used, the MTDN shall mix the HMA after delivery by the hauling equipment and prior <br /> 2 to laydown by the paving machine. Mixing of the HMA shall be sufficient to obtain a uniform <br /> 3 temperature throughout the mixture. If a windrow elevator is used, the length of the windrow <br /> 4 may be limited in urban areas or through intersections, at the discretion of the Engineer. <br /> 5 I <br /> 6 To be approved for use, an MTV: <br /> 7 <br /> 8 1. Shall be self-propelled vehicle, separate from the hauling vehicle or paver. <br /> 9 2. Shall not be connected to the hauling vehicle or paver. <br /> 10 3. May accept HMA directly from the haul vehicle or pick up HMA from a windrow. I <br /> 11 4. Shall mix the HMA after delivery by the hauling equipment and prior to placement <br /> 12 into the paving machine. <br /> 13 5. Shall mix the HMA sufficiently to obtain a uniform temperature throughout the I <br /> 14 mixture. <br /> 15 <br /> 16 To be approved for use, an MTD: <br /> 17 <br /> 18 1. Shall be positively connected to the paver. I 19 2. May accept HMA directly from the haul vehicle or pick up HMA from a windrow. <br /> 20 3. Shall mix the HMA after delivery by the hauling equipment and prior to placement <br /> 21 into the paving machine. <br /> 22 4. Shall mix the HMA sufficiently to obtain a uniform temperature throughout the <br /> 23 mixture. <br /> 24 I <br /> 25 5-04.3(3)E Rollers <br /> 26 Rollers shall be of the steel wheel, vibratory, oscillatory, or pneumatic tire type, in good <br /> 27 condition and capable of reversing without backlash. Operation of the roller shall be in <br /> 28 accordance with the manufacturer's recommendations. When ordered by the Engineer for <br /> 29 any roller planned for use on the project, the Contractor shall provide a copy of the I <br /> 30 manufacturer's recommendation for the use of that roller for compaction of HMA. The <br /> 31 number and weight of rollers shall be sufficient to compact the mixture in compliance with <br /> 32 the requirements of Section 5-04.3(10). The use of equipment that results in crushing of the <br /> 33 aggregate will not be permitted. Rollers producing pickup, washboard, uneven compaction I <br /> 34 of the surface, displacement of the mixture or other undesirable results shall not be used. <br /> 35 I 36 5-04.3(4) Preparation of Existing Paved Surfaces <br /> 37 When the surface of the existing pavement or old base is irregular, the Contractor shall bring <br /> 38 it to a uniform grade and cross section as shown on the Plans or approved by the Engineer. I <br /> 39 <br /> 40 Preleveling of uneven or broken surfaces over which HMA is to be placed may be <br /> 41 accomplished by using an asphalt paver, a motor patrol grader, or by hand raking, as I <br /> 42 approved by the Engineer. <br /> 43 <br /> 44 Compaction of preleveling HMA shall be to the satisfaction of the Engineer and may require <br /> 45 the use of small steel wheel rollers, plate compactors, or pneumatic rollers to avoid bridging <br /> 46 across preleveled areas by the compaction equipment. Equipment used for the compaction <br /> 47 of preleveling HMA shall be approved by the Engineer. I <br /> 48 <br /> 2020 PAVEMENT MAINTENANCE OVERLAY PAGE 48 OF 79 SPECIAL PROVISIONS I <br /> WORK ORDER 3727 FEBRUARY 20,2020 <br />