Laserfiche WebLink
r <br /> STALER <br /> DESIGN LLC <br /> RESIDENTIAL-COMMERCIAL <br /> 0 1——7 1— —I Q 23003 SSTS AVE w, <br /> .I W i I 0 1 I 42'-0' - -__.. ❑ ® ❑ 50CC "ED TERRACE.WA veoa3 <br /> Q •, <br /> 12'.7^ L_ 24 7'-10" L Y4 T-7" 14'-0' 0'ft \ b \A` <br /> 2X12 JOIST <br /> r O O O O ao Sir O� O RP2%TO OUTSIDE O O O O <br /> °o e8O z'c�� ® -[- <br /> i!s.� 5�- eei, y�� ♦ o'o y'�r y'� ® e'Gr y.�r 5.�t- y.�r �11`, \\1 ru <br /> I <br /> 0, -I mL. - 4 I 9 i...l G L 61-11]j.F-I f•� y.C1C I:1:,:„.. <- <br /> - \,� <br /> I I I 16"WIDE I -__ ._ _.. ..._. ,1j- �3J j <br /> I— THICKENED I © 1P r I I m " <br /> I- CO THESE DRAWINGS ARE COPYRIGHTED AND MAY <br /> 4 I I=C I <br /> [THICKENED <br /> 52 I I A NOTE:VERIFYALL IM ROUGH IN VCS .' • <br /> O <br /> IA I PLUMBING DIMENSIONS I : S ! U <br /> ® pl <br /> ,c2� OV <br /> c NOT BE COPIED OR REDRAWN WITHOUT THE <br /> WRITTEN PERMISSION <br /> F SIALER DESIGN LLC. <br /> USE <br /> F THIS <br /> OR PERSONS NAMED <br /> m I I I I I I- I I NOTE SCREENED LINES I'- � I J 2< - m CONSENT FROM HER USE ER OR,REUSE LLc. <br /> INDICATE WALLSAND 1 I @Q L ,�- 3 HPBEaNc�AHFIC Rr T„DCONSTRUCTION OF ONE <br /> I I -- I L— FIXTURES ABOVE I i I `/ n 6 �} STRICTLY PROHIBITED <br /> k. /$�'y/l' p I 1 I 1 ,I 4X10 BEARING WALL J L ©2I'AVE l oes ItN'lLc WITHOUT <br /> ry • LO -4 ♦ --._. L.% �. o ♦ D i O to <br /> �I ••••••••••••••.• T f C.L 512'X 11 7/8"FLUSH <br /> �7 <br /> L I <br /> I 14_ <br /> + —— —— 24• • <br /> ti's %- I ' L ' Apt REVISIONS <br /> a <br /> E L DESCRIPTION� DATE DE <br /> T- T BEARING WALL P I I 1 <br /> 'm' I 0 _ 0.1..........1. <br /> 1 ,� ♦ N •'-" _ _]re HANGER IUS,.B/1. (TYP.) 11/20/15 CORRECTION PER CITU <br /> io 0030/15 PERMIT SUBMITTAL <br /> -/ ---- PS 51/4"%11 I I <br /> 0 'I 4 -°� SLAB ON GRADE _ y — — 1• — — — — — ; — — — <br /> _'I Nar <br /> J J ��+ — — — NESS > .DOER <br /> 2'THICRNESS R-10 RIGID INSULATION. 0 ® ? HANGER GLN 5.511 O <br /> OVER ti <br /> TI _ 4•GRANULAR FILL. I �� Io O 6 <br /> I I m I IT.OS.=498.SB I I � <br /> n <br /> al <br /> I 1 t 2 �' �M =� n m< Ore. PROJECT <br /> 4 <br /> J l DIAZ RESIDENCE <br /> c I I P �; `,� 2802 VICTOR PL <br /> �I I J ry�•o I q,SPI I EVERETT,WA 98201 <br /> �L_ J - ___ – ........- - CLIENT: <br /> W10X45(FLUSH) <br /> I I I r) iX L�_ .3__ ; MIIIMIL DIAZ WALTER& <br /> I I 0 \'''-, <br /> s�owho ^`� ' a ® s ' " 'aaospaBAUTISTA NANCY <br /> � � s o a o <br /> ri h1 • 2-CAR GARAGE 0 "' p N ©0 <br /> Ax 19208 48th AVE W <br /> 4"CONC.SLAB m ®� LYNNWOOD,WA 98036 <br /> SLOPE 3' <br /> ♦ I I-1� TO DOORS mON <br /> LI X31 a <br /> E/ SLOPE r m 2 T 1,,,,. <br /> \}"PERI' 01 <br /> (�(� �n SHEET NAME: <br /> dN L��EQ V ' FOUNDATION <br /> II 1 D <br /> I I Ip PLAN, <br /> II _ I _ <br /> ISL J �, NOV 2 3 2015 .� FOUNDATION <br /> ♦ , "' NOTES, MAIN <br /> ,B'6 OmCITY OF EVERETT FRAMING PLAN & <br /> 1 PermitServices MAIN FRAMING <br /> I S.- <br /> i MAIN FRAMING PLAN - �--- NOTES <br /> FOUNDATION PLAN <br /> N SCALE 1/4"=,'-o <br /> SCALE 1/4"=1'-0" <br /> C) <br /> FOUNDATION NOTES <br /> APPROVED <br /> •WRITTEN DIMENSIONS TAKE PRECEDENCE <br /> OVER SCALED DIMENSIONS.VERIFYALL <br /> DIMENSIONSANO CONDITIONS IN THE FIELD •VERIFY ALL PLUMBING DROPS. p,L1 A M/ <br /> •STEP FOUNDATION PER SITE CONDITIONS •FOOTINGS TO BEAR ON UNDISTURBED OR FLOOR FRAMING NOTES oEUABI c4' <br /> VERIFY STEP LOCATIONS WITH DEVELOPER COMPACTED SOIL OF 2000 PSF MIN. '� <br /> •PROVIDE TEMPORARY BRACING AS REQUIRED BEARING CAPADT/MINIMUM DEPTH OF EMBEDMENT •WRITTEN DIMENSIONS TAKE PRECEDENCE n '1 % <br /> UNTILALI PERMANENT CONNECTIONS AND FORALL FOOTINGS SHAU.BE 18 INCHES. OVER SCALED DIMENSIONS.VERIFYALL <br /> DIMENSIONS AND CONDITIONS IN THE FIELD " <br /> STIFFENERS HAVE BEEN INSTALLED. •PROVIDE 4 x 4 PT POSTS UNDER BEAMS •FLOOR SHEATHING SHALL BE 23/32"T&G O.S.B. o 't <br /> (4 x 6AT BEAM SPLICES).PROVIDE RREQUIRED E UNTIL ALL <br /> PERMANENT SUBFLOOR APPLIED WITH LONG DIMENSION ACROSS olsiElA F1" <br /> •SILL 2/0 LT.(SODIUM BORATE PRESSURE TREATED) POSITIVE CONNECTION TO BEAMS CONNECTIONS STIFFENERSFEHAVE JOISTS,STAGGER END JOINTS.GLUE AND NAIL@ALL ••470NAL ENBn� <br /> SILL PLATES w/5/6"-x 4.0"0.HOR.TO BOLTSA .PROVIDE 112"MINIMUM AIRSPACE BETWEEN BEEN INSTALLED. PANEL EDGES AND OVERALL SHEARWALLS w/10d <br /> 323x1/4'WASHERSH 4'BOLT:.TO FOUNDATION CONCRETE AND WOOD.USE PRESSURE TREATED NAILS(Q 61 o.c.AND OVERALL INTERMEDIATE <br /> (TYR U.N.O.).ANCHOR BOLTS SHALL HAVE MIN.7" WOOD WHEN IN CONTACT WITH CONCRETE ALL HEADERS TO BE4x10 DF 02 U.N.O. FRAMING(012"o.c I--E.e✓mc I <br /> EMBEDMENT INTO CONCRETE. •COVER CRAWL SPACE GRADE WITH 6 MIL •ALL GLB TO BE 24F-V4 DF/DF UNLESS <br /> BLACK VAPOR BARRIER.LAP EDGES •NOTED OTHERWISE •FLOOR JOISTS ARE 11 7/8"TJI 110 @ 16"S.C. FOR LATERALAND <br /> 'FLOOR JOISTS TO BE 221s1-1 FR2 AT i6'O.C. 12"MINIMUM.EXTEND 12"MIN UP FDN.WALL ••SEE FLOORAND/OR FRAMING PLANS FOR UNLESS NOTED OTHERWISE. GRAVITY ONLY <br /> UNLESS NOTED OTHERWIBEAM SIZES. •USE SIMPSON HANGERS FOR SINGLE AND <br /> •PROVIDE SOLID BLOCKING ATALL <br /> •FLOOR SHEATHING SHALL BE 23/32"T&G OSB SPREAD FOOTING KEY BEARING POINTS DOUBLE JOIST CONNECTION AND SIMPSON HU PROJECT NUMBER: 2015-13 <br /> S R APPLIED w/LONG DIMENSION ACROSS HANGERS FOR ALL BEAM CONDITIONS. <br /> JOISTS,ISTS.STAGGER END JOINTS.GLUE AND NAIL 4 •■DENOTES SOUR BEARING UNDER DATE: 09-30-15 <br /> ALL PANEL EDGES AND OVER ALL SHEAR WALLS I- -I .454 POST ON 18'518'56" CONCENTRATED LOADS.USE(2)2CR -- <br /> AT6'WALLS.USECHECKED: <br /> W/10046'o.c.AND OVER ALL INTERMEDIATE 0 THICK CONCRETE PAD (2)2x4 AT 4"WALLS. •ALL WINDOW HEADERS TO BE SET ATV PLATES <br /> L. UNLESS NOTED OTHERWISE UNLESS NOTED OTHERWISE PER ELEVATIONS. DRAWN: LS <br /> FRAMING 72"o.c. SHEAR WALL NOTE: <br /> 18" • {SZ;DENOTES POINT LOAD FROM ABOVE --- <br /> •BEAMS TO BE C ID OF/{2 SEE PLAN FOR SHEAR WALL LOCATIONS STATUS. SUB-1 <br /> =4x4 POST ON 24"x24'58" CROSS HATCHED WALLS INDICATE • AT POST TO FDN. <br /> UNLESS NOTED OTHERWISE 0 THICK CONCRETE PAD COORDINATE W/SHEAR WALL SCHEDULE BEARING WALLS TO BE FRAMED WITH E'PB'POST BASES CONNECTIONS U.N.O.AND'AC POST CAPS AT <br /> •PROVIDE SOLID BLOCKING OVER L J w/(3)#4 EACH WAY FOR ANCHOR BOLT SIZE AND SPACING. 2x STUDS AT 16"0.C.MAX U.N.O. POST TO BEAM CONNECTIONS ..AUG. <br /> ALL SUPPORTS 24" ,„z„,.,SHADED AREAS INDICATE SOFFITED <br /> •I1 AREAS.SEE PLANS FOR DEPTH <br /> fINDICATES STRAP HOEDOWNS,PER PLANS, •ALL 40 HEADERS TO BE INSULATED WITH RIO RIGID <br /> LOCATED AT ENDS OF MAIN FLOOR SHEAR =4x4 POST ON 3092,01:8" •ALLVOID SPACES TO BE FIRE AND DRAFT INSUL(TYP) <br /> WALLS ABOVE. INSTALL PER DETAILS ONTHICK CONCRETE PAD STOPPED PER IBC <br /> SHEETS S1 AND S2 AND MANUFACTURER'S . w/(4)44 EACH WAY • <br /> SPECIFICATIONS. SEE R/S2 FOR RETROFIT ®J 30^ <br /> HOLDOWN. / I c 1 01;10 <br /> D )/ PLOT SCALE:1:1 <br />