Laserfiche WebLink
PU BLINORKS PERMITDate Applied: 3/19/2019 <br /> City of Everett Permit ServicesLI <br /> Publb�IIIIrks Permit#: PW1903-037 <br /> EVERETT 3200 Cedar Street, 2"d Floor Associated Bldg Permit#: <br /> Everett, WA 98201 Planning Reference#: <br /> WASHINGTON 425-257-8810 Public Works Fee: $1584.33 <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: 0 9 0 C T 2019 <br /> SJM LTD MIKE STEVENSON SJM LTD MIKE STEVENSON <br /> P 0 BOX 1460 P 0 BOX 1460 <br /> EVERETT,WA,98201 EVERETT,WA,98201 <br /> PHONE: PHONE: <br /> TAX PARCEL ID#:00516863901101 SITE ADDRESS:2701 WALNUT ST <br /> DESCRIPTION:PARKING STALLS,PLANTER STRIP,LANDSCAPING <br /> THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br /> PERMIT CONDITIONS: <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett'Design and Construction Standards and <br /> Specifications for Development'. <br /> 3. Call Location Underground Service 48 hours before you dig.The day you call does not count.TOLL FREE NUMBER 811. <br /> 4. Site Civil Work to be done per plans,SWPPP,and drainage report approved by the City of Everett Public Works Department dated <br /> 04/04/2019.Approved plans must remain on job-site at all times. <br /> 5. Inspections are required for all stages of construction.Visit the City's Online Permitting Portal at pw.everettwa.gov to formally <br /> request all required inspections. Flyers are provided at permit issuance with instructions on how to request an inspection online. <br /> 6. A Landscape Inspection is required by the Planning Department prior to final by the Public Works Inspector.Schedule the existing <br /> Planning Landscape inspection under"My Active Inspections"in your dashboard on the Online Permitting Portal. <br /> 12.This permit must be finaled in order to close out this permit/grant a Certificate of Occupancy. Request a final inspectapn onl'I by <br /> I�m <br /> selecting PW 22-Site Final within the Online Permitting Portal Inspection Requests when all items have been completedr ttr�,s r rmit. <br /> Public Works Permit Fee Breakdown: c,�` "' '�' <br /> 6 4 r——I L- G y:c5 en <br /> ".a co i' , <br /> Erosion control $200.00 ` 1 <br /> Grade/Fill/Excavate(40 CY) $25.00 --Z) =i<:? <br /> Parking lot paving(1,640 S.F.) $45.00 e 1—.....1.7.. <br /> PW Plan Review $300.00 r-..:) <br /> PW Site Inspection $600.00 IQ.I •ri' <br /> Stormwater system develp.fee(1,666 S.F.) $414.33 03.1 <br /> t:L1 <br /> :`TZN• ?• •rte% *+ <br /> +.,, p1 •••••.e"-,t. 1.T9 C_71.^�? C.? <br /> vac?ca > r-.3-1:-.. <br /> w <br /> T. <br /> City of Everett Official Use Only ACKNOWLEDGEMENT OF CONDITIONS <br /> The undersigned owner/applicant hereby agrees to hold and save harmless <br /> � the City of Everett from any and all claims for damages,costs,expenses,or <br /> la� / ///) causes of action that ma •'se because of installation and maintenance of <br /> A�� — f I the improvement •,;.•....-right-of-way use here to applied for and further <br /> •ppro,ed for Construction blit Works) to agrees to rem. a upon notice from the City and to replace public <br /> property da��j'�hereby. <br /> FINAL INSPECTION Date A, /0_ f <br /> Approved as Constructed(PW Inspector) pure of Applicant Date <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND / ER IS TO BE DILIGENTLY PURSUED TO COMPLETION.THIS PERMIT MAY BE CANCELLED BY THE <br /> CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 180-DAY DURATION.EACH INSPECTION E • E EXPIRATION DATE 180 DAYS TO KEEP THE PERMIT OPEN WHILE WORK IS ACTIVE. <br /> O <br />