Laserfiche WebLink
.., <br /> .,* <br /> ,.. <br /> INSPECTION REPORT 1,0123 tAs,r, <br /> A1DateM ( /��,� <br /> _ \ E Perini : 3I Ba 6 O0 i® <br /> Contractor: TbAv\ S 111(15.J <br /> ' it'SOwner: l' it'...- <br /> Site <br /> ite Address: Zai,6 t—l_ LD <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑ServiceFraming ❑Rooftop Units ❑Water Service <br /> ❑Grounding _I Insulation ❑Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION: <br /> --- ------ - ------ -- <br /> ❑ APPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> ❑ OK FOR T.C.O. ❑ CORRECTION REQUESTED ❑ <br /> ❑ O C.O. ❑ VIOLATION <br /> G N`e E TO PERFORM INSPECTION: <br /> V, ALL(425)257-8881 FOR REINSPECTION-24 hour notice required <br /> Aj - mcc ` c,7-c l�'. - . <br /> 1 — LL'C 7' -' r. /. <br /> .1? -p fie 'A/6 .z.--A/J/,. <br /> Inspector: R/, r'' <br /> Date: /40- V-11 <br /> EIR(10/06) DATABAR,INC. <br />