Laserfiche WebLink
instryVt� <br /> 4 <br /> For Th• fa 0f Your Bulldog <br /> April 08, 2020 <br /> Mr. Chris Lark <br /> City of Everett <br /> Project Manager, Facilities <br /> 425-754-6363 <br /> 2930 Wetmore Ave <br /> Everett,WA 98201 <br /> SUBJECT: CITY OF EVERETT—ESCO ENERGY PROJECT <br /> Dear Chris: . <br /> Following our site walk in October and subsequent correspondence l oc known try isa pleased l to <br /> present this proposal to complete Directed EnergyEngineering, <br /> A) <br /> investment grade audit with the City of Everett in conjunction included ith enDept ta Enterpriseof <br /> ent Services. <br /> The complete list of deliverables under this agreement <br /> The target facilities and initiatives to be included in the project scope are: <br /> V Police HQ—Window Upgrades Upgrades (3) <br /> V Municipal (Wall Street) Building —Elevator Upg <br /> ✓ Identify and analyze performance-based contracting measures along with their <br /> associated savings, costs, and potential for utility rebates and grants. <br /> MEASURE BAcKGROUNO / DESCRIIPTION: <br /> The following scope is proposed for each measure per our previous correspondence: <br /> Police HQ:Windows Upgrades: <br /> Replace existing standalone windows and window c'�sQaraaStakeho dersll systems � Modify scope to match <br /> new per requirements <br /> of AHJ (Authority Having Jurisdiction) and Historical <br /> budget and prioritize as follows: <br /> - South and West Facing standalone windows <br /> - East and North Facing standalone windows <br /> - Window curtain wall systems North &South <br /> - Replacement of the Police HQ Stairwell Skylight <br /> Everett Municipal (Wall Street) Building —Elevator Upgrades: <br /> Modernize existing (3) elevators as follows: <br /> - Modernize Cabin <br /> - Modernize Controls <br /> - Change out motors <br /> - Replace cables <br /> - Identify and develop code required machine room upgrades. <br /> 5005 Third Avenue South*Seattle,WA 4 43124-0567*206.762.3311 *Fax 206.762.2624 <br />