Laserfiche WebLink
• <br /> Project-Water Main Replacement Q Evergreen Way Rebid <br /> Change Order No..002 <br /> Change Order Effective Date:March 25,2020 <br /> Contractor and City agree as follows: <br /> I. The scope of Work shall be changed to.the extent described in Exhibit A. <br /> 2. The amount of the change order for the changes described in Exhibit A,represents <br /> complete compensation for the changes described in Exhibit A,including all direct and <br /> indirect costs and impacts.The contract price shall be adjusted as described in this <br /> Change Order. With respect to Washington State sales tax,the amount.of the change <br /> order includes.such tax unless the box for"exclusive of Wash.State Sales Tax"is <br /> checked on the preceding page: <br /> 3. Everett Municipal Code 3.80.050 sets forth the threshold amounts below which the <br /> Mayor or his designee is authorized to direct Contractor to perform additional work.In <br /> calculating Such threshold amounts,Washington State sales tax,if applicable to the <br /> Work,has.been.considered. <br /> 4. The duration-of the Contract shall be adjusted to the extent described in this Change <br /> Order. <br /> 5. Contractor waives and releases any and all claims'arising outof,or.related to,.this <br /> Change Order,the work described in Exhibit A,and all work.and actual or constructive <br /> changes that occurred or"began:prior to the date of this Change Order,including,but <br /> not limited to,claims for equitableadjust ent of time-and compensation,delay,impact, <br /> overhead,or inefficiencies. This'provision does not apply to requests for.equitable <br /> adjustment of time or price.for whichthe Contractor timely and properly provided <br /> notice of a differing site condition,protest,dispute,claim or Contract Claim as required <br /> by the Contract Documents. If:the Contract Documents establish a time period for <br /> notice of'a differing site condition,protest,dispute,claim,or-Contrac t Claim that-ends <br /> . after the date of this Chan;e Order,but"relates to work performed"prior to the date of <br /> this Change Order,then this provision does not apply if the Contractor timely and <br /> properly submits such notice. <br /> 6. This Change Order only changes the contract between Contractor and City tv the <br /> extent explicitly provided herein. <br /> CITY <br /> Attest: Approved As to Form: <br /> • <br /> Mayor City Clerk City Attorney <br /> • <br /> Date: Date: Date: <br /> Recommended Sy: <br /> Construction- Project Engineer (if Etx-gineering Department Director <br /> Manager(if applicable) Manager(if • <br /> applicable) applicable) <br /> Page 2 of 4 <br /> 77 <br />