Laserfiche WebLink
Seaway Transit Center Fee Estimate <br />I� <br />Permit <br />Evaluation <br />How Fees Calculated <br />Fee Breakdown <br />Fee Total <br />At Submittal <br />Due at Submittal <br />At Pickup <br />Building <br />$752,500.00 <br />$3,233.75 for the first $500,000 plus $4.75 for each additional <br />$1,000 <br />($4.75 x 253) + $3,233.75 <br />$4,435.50 <br />$2,883.08 <br />65% <br />$1,552.43 <br />Grading <br />31,360 CY <br />$365 for first 10,000 cubic yards, plus $80 for each additional <br />10,000 CY <br />$365 + $80 + $80 <br />$525.00 <br />$525.00 <br />Public Works <br />$1,520,613.00 <br />Per Kirk Brooks: Value x 4.5% <br />1520613 x .045 <br />$68,427.59 <br />$68,427.59 <br />Review <br />Value x 0.015% <br />1520613 x .015 <br />$22,809 <br />Inspections <br />Value x 0.03% <br />1520613 x .03 <br />$45,618 <br />Utilities <br />Water <br />(2) 2" Meters <br />2" - $4,402 <br />2 x $4,402 <br />$8,804.00 <br />$8,804.00 <br />Sewer <br />New Connection <br />$70 <br />$70 <br />$70.00 <br />$70.00 <br />System Development <br />Commercial Industrial <br />(EMC 14.08.135) <br />Water - $2,825; Sewer - $4,213 <br />$2,825+$4,213 <br />$7,038.00 <br />$7,038.00 <br />Erosion Control <br />Flat Fee <br />$200 <br />$200 <br />$200.00 <br />$200.00 <br />Mechanical Plumbing <br />$156,557 <br />Base $200; $10/fixture; $10 fee for first $501-$1,000, $10 for <br />each additional $5,000 <br />$25 + $10(22) + $10 + $10(32) <br />$575.00 <br />$575.00 <br />Electrical 1$558,504 <br />$250,001-$1,000,000 = $3,175 + .7% of cost over $250,000 <br />1$3,175 + .7(558504-250000) <br />$5,334.53 <br />$5,334.53 <br />Total <br />$715,061 <br />$95,409.61 <br />$92,526.54 <br />