Laserfiche WebLink
A <br />4. Permit Status: <br />• Grading & Building Permits — Business License. These two are fully paid & ready for pick-up. <br />• Mechanical — Business License. Deferred to sub. <br />• Electrical — Business License. State L & I. Deferred to sub. <br />• Plumbing — Business License. Deferred to sub. <br />• DOE NOI — Stormwater NPDES: Already issued to CT. Needs to be transferred to ICI. <br />• Signage Permits: Paid and ready for Pick up <br />• Other Permits, approvals and checklists that are already secured: NEPA, SEPA, Land Use, <br />Traffic, ESA, DCE, IDP, FTA, DNS, Tribes, DAHP, CRA, CZM <br />• Inspections by City of Everett: <br />• Other City -related issues <br />5. Utility Agency Issues <br />Water & Sewer: City of Everett (Utility Availability). City & GC to communicate directly. <br />Other <br />Cable/Data/Phone: PSE; Comcast; Wave <br />Electrical & Temp. Power (PUD) <br />■ Location <br />■ Schedule <br />■ Other Utility Issues <br />6. Adjacent Property Owner Issues <br />o PUD — safety & security issues <br />o PUD — ingress & egress issues <br />o PUD —other issues <br />7. Construction Related Issues <br />o Everett Transit will move their Bus Stop on 75th. How long can they keep it in place? <br />o Mobilization <br />o TESC, fencing, construction sign, etc. — starts on <br />o Install Construction Vehicle Entrance/Exit with rock. Location is on plans. <br />o Video of surrounding Street conditions before construction starts. Submit Video to Owner <br />o Traffic coordination — Maintaining Traffic Circulation <br />