My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7505 SEAWAY BLVD 2022-05-13
>
Address Records
>
SEAWAY BLVD
>
7505
>
7505 SEAWAY BLVD 2022-05-13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2022 4:20:04 PM
Creation date
6/4/2020 10:42:00 AM
Metadata
Fields
Template:
Address Document
Street Name
SEAWAY BLVD
Street Number
7505
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
660
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Construction Phase <br />1. Construction equipment and vehicles must be maintained so they do not leak fuels or <br />lubricants. During construction, a staging area must be specified for all vehicle maintenance <br />activities. The staging area must be located well away from all drainage courses. Where <br />possible, all stormwater from related maintenance areas must be directed to the sanitary <br />sewer, rather than the stormwater system. (SEPA Earth, Water and Environmental Health <br />Policies) <br />2. During construction activities, all spills of fuel and hazardous materials must be contained <br />and removed in such a manner as to prevent their entering the waters and soils of the <br />State. Cleanup of spills must take precedence over other work on site. (SEPA Earth, Water <br />and Environmental Health Policies) <br />3. During construction, all petroleum products, chemicals, and building materials that could <br />contaminate runoff must be stored in a lined covered area. An impervious berm must be <br />constructed around the perimeter of the storage area. The storage area must be located <br />away from environmentally sensitive areas. (SEPA Earth, Water and Environmental Health <br />Policies) <br />Operation Phase <br />4. Dumpsters must be covered and maintained, so that stormwater runoff from refuse does <br />not enter storm drains or infiltrate into soil. (SEPA Earth, Water and Environmental Health <br />Policies) <br />5. On sites containing hazardous materials, procedures to use in case of spills must be posted. <br />(SEPA Earth, Water and Environmental Health Policies) <br />6. All chemicals or products of a. hazardous or toxic nature that maybe used or stored on the <br />site must be stored under cover and isolated from the storm drainage system. (SEPA Earth, <br />Water and Environmental Health Policies) <br />Section 8: PUBLIC SERVICES AND UTILITIES — No additional mitigation identified. <br />ADDITIONAL INFORMATION FOR DEVELOPER: <br />The following information is provided for the developer's benefit. These are not SEPA <br />conditions but are associated with implementing the Planned Action and other laws or <br />requirements. All requirements are preliminary in nature, and are based upon the preliminary <br />site plan and the ordinances in effect at time of submittal for SEPA review. The proposal must <br />Planned. Act o ] 6-034 <br />5of14' <br />
The URL can be used to link to this page
Your browser does not support the video tag.