My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7505 SEAWAY BLVD 2022-05-13
>
Address Records
>
SEAWAY BLVD
>
7505
>
7505 SEAWAY BLVD 2022-05-13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2022 4:20:04 PM
Creation date
6/4/2020 10:42:00 AM
Metadata
Fields
Template:
Address Document
Street Name
SEAWAY BLVD
Street Number
7505
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
660
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FIELD REPORT <br />."Y" 21312 30TH Drive SE <br />Suite 110 <br />HWA Job No. Task # <br />Report No. <br />A T r Bothell, WA 98021.7010 <br />�7 V VA lTFnsCTF NCF S INC. Tel. 425-774-0106 <br />2014-117 <br />061 <br />City Project No. <br />Date <br />Fax. 425-774-2714 <br />June 7 - 8, 2019 <br />Project Name <br />Location or Address <br />Day of the Week <br />Seaway Transit Center <br />Everett, Washington <br />Friday - Saturday <br />Owner <br />Owner Rep. <br />Weather Temp. (F) <br />Community Transit <br />Dan Jerome <br />Cloud 50s — 60s <br />Client <br />Client Rep. <br />HWA Project Engineer <br />Perteet, Inc. <br />Bill Mitchell <br />Steve. Greene <br />Contractor <br />Contractor Rep. <br />HWA Field Rep. <br />ICI Construction / Granite <br />Reed <br />I Greg Krankurs <br />compaction application prior to testing. The density tests were taken at or near the test locations selected by the <br />QC representative. Test results are summarized on the attached `Field Compaction Test Report'. Total tonnage <br />placed for the final lift was approximately 97 tons of Class %2-inch HMA delivered from Granite Smith Island <br />plant. <br />CONFORMANCE OF THIS ITEM: To the best of the inspector's knowledge, the item inspected was found in <br />conformance with approved plans, specifications and RFIs. <br />Time spent on the project today was 11.0 hours, including equipment load/unload, travel time, <br />testing/observation, sampling and writing this report <br />SIGNATURES: <br />Signed: Reviewed: <br />HWA Field Representative HWA Reviewer <br />Note: Field Reports are preliminary until signed by both the HWA Field Representative and HWA Reviewer <br />FR-061 06-07-2019 and 06-08-2019 GK.docxGK <br />
The URL can be used to link to this page
Your browser does not support the video tag.