Laserfiche WebLink
4.5 SEAT WALLS 10 <br /> 4.5.1 Seat Wall Subgrade Preparation 10 <br /> 4.6 SIGNAL POLE FOUNDATIONS 11 <br /> 4.7 STORMWATER MANAGEMENT 12 <br /> 4.8 GENERAL EARTHWORK 13 <br /> 4.8.1 Temporary Excavation 13 <br /> 4.8.2 Dewatering 13 <br /> 4.8.3 Structural and Non-Structural Fill 13 <br /> 4.8.4 Pipe Bedding and Trench Backfill 14 <br /> 4.8.5 Compaction 14 <br /> 4.8.6 Wet Weather Earthwork 15 <br /> 4.9 SOIL CONTAMINATION CONSIDERATIONS 16 <br /> 5. CONDITIONS AND LIMITATIONS 16 <br /> 6.REFERENCES 18 <br /> FIGURES (Following Text) <br /> Figure 1 Vicinity Map <br /> Figure 2 Site and Exploration Plan <br /> Figure 3 Signal Pole Designation and Location <br /> Figure 4 LPILE Lateral Design Parameters for Signal Poles 2 and 3 <br /> Figure 5 Lateral Earth Pressure on Detention Vault <br /> Appendix A: Field Exploration Logs <br /> Figure A-1 Legend of Terms and Symbols Used on Exploration Logs <br /> Figures A-2—A-7 Boring Logs BH-1 through BH-6 <br /> Figures A-8—A-12 Boring Logs HH-1 through HH-5 <br /> 2014-117 Final Geotechnical Report 11 HWA GEOSCIENCES INC. <br />