My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2320 106TH ST SW 2022-08-29
>
Address Records
>
106TH ST SW
>
2320
>
2320 106TH ST SW 2022-08-29
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2022 8:27:25 AM
Creation date
6/5/2020 10:53:24 AM
Metadata
Fields
Template:
Address Document
Street Name
106TH ST SW
Street Number
2320
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
630
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
October 14,2015 <br /> Project No.T-6116-2 <br /> —ie native soils encountered at the site contain a sufficient amount of soil fines that will make them difficult to <br /> compact as structural fill when too wet or too dry. The ability to use native soils from site excavations as <br /> structural fill will depend on its moisture content and the prevailing weather conditions at the time of <br /> construction. If wet soils are encountered,the contractor will need to dry the soils by aeration during dry weather <br /> conditions. Alternatively, the use of an additive such as Portland cement, cement kiln dust (CKD), or lime to <br /> stabilize the soil moisture can be considered. If the soil is amended, additional Best Management Practices <br /> (BMPs) addressing the potential for elevated pH levels will need to be included in the Storm Water Pollution <br /> Prevention Program(SWPPP)prepared with the Temporary Erosion and Sedimentation Control (TESC)plan. <br /> If grading activities are planned during the wet winter months, or if they are initiated during the summer and <br /> extend into fall and winter, the owner should be prepared to import wet weather structural fill. For this purpose, <br /> we recommend importing a granular soil that meets the following grading requirements: <br /> U.S. Sieve Size Percent Passing <br /> 6 inches 100 <br /> No. 4 75 maximum <br /> No. 200 5 maximum* <br /> * Based on the 3/4-inch fraction. <br /> Prior to use, Terra Associates, Inc. should examine and test all materials imported to the site for use as structural <br /> fill. <br /> 11 ctural fill should be placed in uniform loose layers not exceeding 12 inches and compacted to a minimum of <br /> • percent of the soil's maximum dry density, as determined by American Society for Testing and Materials <br /> (ASTM)Test Designation D-698 (Standard Proctor). The moisture content of the soil at the time of compaction <br /> should be within two percent of its optimum, as determined by this ASTM standard. In nonstructural areas, the <br /> degree of compaction can be reduced to 90 percent. <br /> 5.3 Excavations and Shoring <br /> All excavations at the site associated with confined spaces, such as utility trenches, must be completed in <br /> accordance with local, state, and federal requirements. Based on regulations outlined in the Washington <br /> Industrial Safety and Health Act (WISHA), the upper one and one-half to three and one-half feet would be <br /> classified as Type C soil. The native dense till soils would be classified as Type A soil. <br /> Accordingly, temporary excavations in Type C soils should have their slopes laid back at an inclination of 1.5:1 <br /> (Horizontal:Vertical)or flatter, from the toe to the crest of the slope. Side slopes in Type A soils can be laid back <br /> at a slope inclination of 0.75:1 or flatter. For temporary excavation slopes less than 8 feet in height in Type A <br /> soils, the lower 3.5 feet can be cut to a vertical condition, with a 0.75:1 slope graded above. For temporary <br /> excavation slopes greater than 8 feet in height up to a maximum height of 12 feet, the slope above the 3.5-foot <br /> vertical portion will need to be laid back at a minimum slope inclination of 1:1. No vertical cut with a backslope <br /> immediately above is allowed for excavation depths that exceed 12 feet. In this case, a four-foot vertical cut with <br /> an equivalent horizontal bench to the cut slope toe is required. All exposed temporary slope faces that will remain <br /> open for an extended period of time should be covered with a durable reinforced plastic membrane during <br /> =instruction to prevent slope raveling and rutting during periods of precipitation. <br /> Page No. 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.