Laserfiche WebLink
Section SOLIDS HANDLING Page 508 <br /> TESTING <br /> Commercial testing shall be required and include the following: <br /> -The pump shall be visually inspected to confirm that it is built in accordance with the specification as to HP,voltage,phase and hertz. <br /> -The motor seal and housing chambers shall be meggered for infinity to test for moisture content or insulation defects. <br /> -Pump shall be allowed to run dry to check for proper rotation. <br /> - Discharge piping shall be attached, the pump submerged in water, and amp readings shall be taken in each leg to check for an <br /> imbalanced stator winding. If there is a significant difference in readings, the stator windings shall be checked with a bridge to <br /> determine if an unbalanced resistance exists.If so,the stator shall be replaced. <br /> -The pump shall be removed from the water,meggered again,dried and the motor housing filled with dielectric oil. <br /> Optional testing available:Megger Test,Hydrostatic Test,Non-Witnessed Hydraulic Institute Performance Test. <br /> PAINT <br /> The pump shall be painted with waterborne hybrid acrylic/alkyd paint.This custom engineered,quick dry paint shall provide superior <br /> levels of corrosion and chemical protection. <br /> 444 PENTAIR HY©ROMATIC' <br /> October ©2014 Pentair Ltd. <br />