My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2320 106TH ST SW 2022-08-29
>
Address Records
>
106TH ST SW
>
2320
>
2320 106TH ST SW 2022-08-29
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2022 8:27:25 AM
Creation date
6/5/2020 10:53:24 AM
Metadata
Fields
Template:
Address Document
Street Name
106TH ST SW
Street Number
2320
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
630
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Stormwater Pollution Prevention Plan <br /> • Revegetation of exposed areas and maintenance of that vegetation shall <br /> be an integral part of the clearing activities during each phase of <br /> construction, per the Scheduling BMP (C 162). <br /> Seasonal Work Limitations <br /> • From October 1 through April 30, clearing, grading, and other soil <br /> disturbing activities shall only be permitted if shown to the satisfaction of <br /> the local permitting authority that silt-laden runoff will be prevented from <br /> leaving the site through a combination of the following: <br /> o Site conditions including existing vegetative coverage, slope, soil type, <br /> and proximity to receiving waters; and <br /> O Limitations on activities and the extent of disturbed areas; and <br /> o Proposed erosion and sediment control measures. <br /> • Based on the information provided and/or local weather conditions, the <br /> local permitting authority may expand or restrict the seasonal limitation on <br /> site disturbance. <br /> • The following activities are exempt from the seasonal clearing and <br /> grading limitations: <br /> O Routine maintenance and necessary repair of erosion and sediment <br /> control BMPs; <br /> o Routine maintenance of public facilities or existing utility structures that do <br /> not expose the soil or result in the removal of the vegetative cover to soil; <br /> and <br /> o Activities where there is 100 percent infiltration of surface water runoff <br /> within the site in approved and installed erosion and sediment control <br /> facilities. <br /> Coordination with Utilities and Other Jurisdictions <br /> • Care has been taken to coordinate with utilities, other construction <br /> projects, and the local jurisdiction in preparing this SWPPP and <br /> scheduling the construction work. <br /> Inspection and Monitoring <br /> • All BMPs shall be inspected, maintained, and repaired as needed to <br /> assure continued performance of their intended function. Site inspections <br /> shall be conducted by a person who is knowledgeable in the principles <br /> and practices of erosion and sediment control. This person has the <br /> necessary skills to: <br /> O Assess the site conditions and construction activities that could impact <br /> the quality of stormwater, and <br /> 12 17576.003.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.