My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2320 106TH ST SW Geotech Report 2022-10-25
>
Address Records
>
106TH ST SW
>
2320
>
Geotech Report
>
2320 106TH ST SW Geotech Report 2022-10-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2022 1:31:16 PM
Creation date
6/5/2020 11:14:05 AM
Metadata
Fields
Template:
Address Document
Street Name
106TH ST SW
Street Number
2320
Address Document Type
Geotech Report
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EARTH PRESSURE LOADING DIAGRAM <br /> 110 CANTILEVERED SOLDIER PILE SHORING <br /> - _ <br /> H - <br /> 35 pcf FOR HORIZONTAL BACKSLOPE <br /> 45 pcf FOR TEMPORARY 1H:1V BACKSLOPE <br /> NOTE: <br /> — <br /> FOR DESIGN OF LAGGING EARTH <br /> _ <br /> PRESSURE CAN BE REDUCED BY 50 <br /> PERCENT TO ACCOUNT FOR ARCHING <br /> BETWEEN SOLDIER PILES. SOLDIER PILE <br /> 110 - SPACING SHOULD NOT EXCEED 8 FEET. <br /> 35H psf <br /> 350 pcf PASSIVE EARTH <br /> PRESSURE TAKEN OVER 2 <br /> PILE DIAMETERS <br /> (VALUE INCLUDES SAFETY <br /> FACTOR OF 1.5) <br /> . _ <br /> D <br /> NOT TO SCALE <br /> EARTH PRESSURE LOADING DIAGRAM <br /> O Terra CANTILEVER SOLDIER PILE SHORING <br /> PROPOSED STORAGE BUILDING <br /> \* • • Associates! Inc. EVERETT, WASHINGTON <br /> Consultants in Geotechnical engineering <br /> EnvirLenetTitaHrith Sciences Proj. No.T-6116-2 Date OCT 2015 j Figure 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.